My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-2007 Council Agenda
>
City Council Packets
>
2000-2009
>
2007
>
09-12-2007 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2011 10:13:28 AM
Creation date
12/12/2011 10:07:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This contract is amended as follows: <br />WHEREAS: <br />WHEREAS: <br />WHEREAS: <br />CHANGE ORDER #2 <br />(Attachment) <br />It was determined by the Engineer that a conflict existed between an existing <br />storm sewer pipe and the new street grades and the condition of the existing pipe <br />required replacement; and <br />It would be necessary and more cost effective to remove and replace the storm <br />pipe at this time; and <br />It was also determined by the Engineer that the contractor should complete an <br />exploratory dig to locate the exact placement of the watermain prior to installation <br />of the storm sewer discharge pipe to the Sleepy Hollow pond to determine if a <br />modification of the storm sewer alignment was needed. <br />NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AND UNDERSTOOD THAT: <br />1. The Contractor shall complete the above described changes and additions to the project. <br />2. Payment for the work was reviewed and approved by the Engineer. <br />3. The Contractor will not make claim of any kind or character for any other costs or <br />expenses that he may have incurred or that he may hereafter incur in performing the <br />work or furnishing the materials of this agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.