Laserfiche WebLink
ITEM <br />NO. <br />SPEC <br />REF, <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />0.00 <br />60.00 <br />1.00 <br />52,200.00 <br />2 <br />6 <br />, 2104.505 REMOVE BITUMINOUS PAVEMENT <br />i SY <br />2210.00 <br />32.001 0.00 <br />50.00 <br />2.210.00 <br />5442000 <br />7 <br />2104.509 !REMOVE SIGN <br />EACH <br />4.00 <br />3150.00 <br />0.00 <br />30.00 <br />4.00 <br />3600.00 <br />8 <br />2104.511 <br />SAW CUT BITUMINOUS (FULL DEPTH) <br />LF <br />170.00 <br />33.90 <br />0.00 <br />30.00 <br />66.00 <br />3257.40 <br />9 <br />2104.523 <br />SALVAGE MAILBOX <br />EACH <br />8.00 <br />34.90 <br />0.00 <br />50.00 <br />8.00( <br />539.20 <br />10 <br />2105.501 <br />COMMON EXCAVATION (P) <br />.,, <br />680.00 <br />$8.50 <br />0.00 <br />30.00 <br />680.00 35.780.00 <br />11 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) <br />CY <br />850.00 <br />510.00 <br />0.00 <br />50.00 <br />850.001 58.500.00 <br />12 <br />2131.502 <br />CALCIUM CHLORIDE <br />GAL <br />1.000.00 <br />31.10 <br />0.00 <br />50.00 <br />0.00 50.00 <br />13 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />I TON <br />1.10000 <br />515.90 <br />0.00 <br />50.00 <br />1206 .721 519,186.85 <br />14 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT <br />SY <br />35.00 <br />510.00 <br />22.00 <br />3220.00 <br />22.00 3220.00 <br />15 <br />2350.501 <br />TYPE SP WEAR COURSE MIXTURE <br />TON <br />240.00 <br />547.50 <br />230.92 <br />510,968.70 <br />230.92 310.968.70 <br />16 <br />2350.501 <br />TYPE SP WEAR COURSE MIXTURE (DRIVEWAY) <br />TON <br />5.00 <br />3100.00 <br />0.00 <br />50.00 <br />16.83 <br />61,683.00 <br />17 <br />2350,502 <br />TYPE SP NON WEARING COURSE MIXTURE (BASE) <br />TON <br />240.00 <br />546.50 <br />0.00 <br />50,00 <br />235.59 <br />510,954.94 <br />18 <br />2411.604 <br />BOULDER RETAINING WALL <br />SF <br />180.00 <br />828.50 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />19 <br />2502.602 <br />4 -INCH PERF PE PIPE DRAM <br />LF <br />800.00 <br />312.50 <br />0.00 <br />50.00 <br />630.00 <br />57,875.00 <br />20 <br />2503.541 <br />12" RC PIPE SEWER DES 3006, CLV <br />LF <br />28.00 <br />530.60 <br />0.00 <br />50.00 <br />28.00 <br />5856.80 <br />21 <br />2503.541 <br />15" RC PIPE SEWER DES 3006, CLV <br />LF <br />32.00 <br />331.62 <br />0.00 <br />30.00 <br />32.00 <br />51,011.84 <br />22 <br />2503.541 <br />16" PVC C905 STORM MAIN <br />LF <br />252.00 <br />554.06 <br />0.00 <br />50.00 <br />252.00 <br />$13,623.12 <br />23 <br />2503,602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />2.00 <br />5359,04 <br />0.00 <br />50.00 <br />2.00 <br />5718,08 <br />24 <br />2504.602 <br />ADJUST VALVE 80X <br />EACH <br />1.00 <br />3200.00 <br />-1.00 <br />- 8200.00 <br />1.00 <br />5200.00 <br />25 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL 24 "X36" <br />EACH <br />2.00 <br />32.040.00 <br />0.00 <br />50.00 <br />2.00 <br />54,080,00 <br />26 <br />2506.502 <br />CONST DRAINAGE STRUCTURE DESIGN 48 -4020 <br />EACH <br />3.00 <br />52,24400 <br />0.00 <br />30.00 <br />3.00 <br />56,73200 <br />27 <br />2506.516 <br />CASTING ASSEMBLY <br />EACH <br />1.00 <br />3250.00 <br />1.00 <br />625000 <br />1.00 <br />6250.00 <br />28 <br />2521.501 <br />CONCRETE SIDEWALK (4 " THICK) <br />SF <br />20.00 <br />54.00 <br />0.00 <br />50.00 <br />55.00 <br />3220.00 <br />29 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN 8618 <br />LF <br />1,380.00 <br />59.50 <br />0.00 <br />$000 <br />1,35900 <br />612.91050 <br />30 <br />2531.507 <br />CONCRETE DRIVEWAY PAVEMENT <br />SY <br />25.00 <br />540.00 <br />0.00 <br />50,00 <br />25.00 <br />51.000.00 <br />31 <br />2531.507 <br />CONCRETE DRIVEWAY APRON (6 " THICK) <br />SY <br />65.00 <br />540,00 <br />0.00 <br />50.00 <br />61.00 <br />62,440.00 <br />32 <br />2540.602 <br />INSTALL SALVAGED MAILBOX <br />EACH <br />8.00 <br />3150.00 <br />0.00 <br />50.00 <br />8.00 <br />61,200.00 <br />33 <br />2563.601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />5500.00 <br />0.00 <br />50.00 <br />1.00 <br />5500.00 <br />34 <br />2564.531 <br />F & I SIGN PANEL <br />SF <br />18.75 <br />$31.00 <br />0.00 <br />50.00 <br />18.75 <br />5581.25 <br />35 <br />2564.602 <br />F & I SIGN POST <br />EACH <br />1,00 <br />5100.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />36 <br />2573.602 <br />SILT FENCE TYPE MACHINE SLICED <br />LF <br />330.00 <br />62.20 <br />0.00 <br />50.00 <br />353.00 <br />577660 <br />37 <br />2573.530 <br />INLET PROTECTION (WIMCO) <br />EACH <br />8.00 <br />$175.00 <br />0.00 <br />50.00 <br />7.00 <br />51.22500 <br />38 <br />2573.530 <br />INLET PROTECTION (STRUCTURE W/0 CASTING) <br />EACH <br />8.00 <br />6175.00 <br />0.00 <br />50.00 <br />6.00 <br />51,050.00 <br />39 <br />2575.513 <br />MULCH MATERIAL <br />CY <br />36.00 <br />630.00 <br />9.00 <br />6270.00 <br />9.00 <br />3270.00 <br />40 <br />SPEC <br />RAIN WATER GARDENS <br />EACH <br />4.00 <br />6800.00 <br />0.00 <br />50.00 <br />2.00 <br />$1,600.00 <br />41 <br />SPEC <br />INLET SEDIMENT REMOVAL (WIMCO) <br />EACH <br />16.00 <br />5100.00 <br />0.00 <br />50.00 <br />8.00 <br />5800.00 <br />42 <br />SPEC <br />SEDIMENT REMOVAL BACKHOE <br />HR <br />2.00 <br />5140.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />43 <br />SPEC <br />GRADATION TEST. CLASS 5 <br />EACH <br />1.00 <br />5125.40 <br />0.00 <br />50.00 <br />1.00 <br />5125.40 <br />44 <br />SPEC <br />PROCTOR TEST. CLASS 5 <br />EACH <br />1.00 <br />6138.60 <br />0.00 <br />50.00 <br />1.00 <br />5138.60 <br />45 <br />SPEC <br />PROCTOR TEST. CLASS 5 <br />EACH <br />2.00 <br />5138.60 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />46 <br />SPEC <br />DENSITY TEST, INPLACE <br />EACH <br />15.00 <br />546.20 <br />1.00 <br />$46.20 <br />700 <br />5323.40 <br />47 <br />SPEC <br />CONCRETE TESTING <br />EACH <br />6.00 <br />5145.20 <br />0.00 <br />50.00 <br />3.00 <br />6435.80 <br />48 <br />SPEC <br />BITUMINOUS CORE DENSITY <br />EACH <br />12.00 <br />5100.00 <br />1.15 <br />5115.00 <br />9.10 <br />5910.00 <br />SCHEDULE 5,0 - SEXTANT AVENUE - TOTAL 511,669.90 5132.637.07 <br />SCHEDULE 6,0 - LABQ,lF RQAD <br />1 <br />2021.501 <br />MOBILIZATION <br />LS <br />1.00 <br />52,200.00 <br />0.00 <br />60.00 <br />1.00 <br />52,200.00 <br />2 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LF <br />270.00 <br />53.00 <br />0.00 <br />50.00 <br />471.00 <br />51,413.00 <br />3 <br />2231.604 <br />BITUMINOUS PATCH SPECIAL <br />SY <br />85.00 <br />32800 <br />000 <br />50.00 <br />83.00 <br />52,324.00 <br />4 <br />2232.501 <br />MILL BITUMINOUS PAVEMENT (2" DEEP) <br />5Y <br />2,850.00 <br />53.00 <br />0,00 <br />50.00 <br />2,420.00 <br />57,260.00 <br />5 <br />2350.501 <br />TYPE SP WEAR COURSE MIXTURE <br />TON <br />500.00 <br />347.50 <br />0.00 <br />50.00 <br />429.26 <br />520,389.85 <br />6 <br />2504.602 <br />ADJUST VALVE BOX <br />EACH <br />3.00 <br />5200.00 <br />0.00 <br />80.00 <br />3.00 <br />550000 <br />7 <br />2506.522 <br />ADJUST FRAME, RING AND CASTING <br />EACH <br />4,00 <br />5350.00 <br />0.00 <br />50,00 <br />8.00 <br />52,80000 <br />8 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN 8618 <br />LF <br />270.00 <br />513.50 <br />0.00 <br />50.00 <br />471.00 <br />56,358.50 <br />9 <br />2563,601 <br />TRAFFIC CONTROL <br />LS <br />1.00 <br />5500.00 <br />0,00 <br />50.00 <br />1.00 <br />5500.00 <br />10 <br />2564.603 <br />4" SOLID LINE WHITE - EPDXY <br />LF <br />3,200,00 <br />50.32 <br />2,592.00 <br />5925.44 <br />2,892.00 <br />5925.44 <br />11 <br />2564.603 <br />4" DOUBLE SOLID LINE YELLOW - EPDXY <br />LF <br />1600,00 <br />50.65 <br />1.590.00 <br />51,033.50 <br />1,590.00 <br />61,033.50 <br />SCHEDULE 6.0 - LABORE ROAD -- TOTAL 31,958.94 545,604.29 <br />