Laserfiche WebLink
SOIL BORING LOG <br />WATER LEVEL MEASUREMENTS DRILLING DATA <br />PROJECT: Valor Site, Ryan Industrial Park, City of Little Canada <br />TIME (HRS) <br />LOG OF BORING NO: 5 <br />CASING <br />DEPTH <br />CAVE -IN <br />DEPTH <br />UKILLINO <br />MUD <br />LEVEL <br />DEPTH <br />SURFACE ELEVATION: 99,59 <br />GEOLOGY <br />N <br />WB <br />SAMPLE <br />LAB & OTHER TESTS <br />IN FEET <br />DESCRIPTION & CLASSIFICATION <br />METHOD: 3 1/4" HAS <br />07/26/07 <br />3:00 <br /># <br />TYPE <br />R <br />W <br />DEN <br />L.L. /P.L. <br />1 <br />Fill <br />20 <br />N <br />1 <br />SBS <br />6 <br />(0 -2') Fill: Brown, Silty Sand, with Gravel, <br />(SM), Moist <br />2 <br />BORING COMPLETED: 07/26/07 <br />(2 -10') Fill: Mixture of Black, Organic, Silty <br />3- <br />Sand (OL -SM), Clay (OL -CL), Gravel and <br />7 <br />N <br />2 <br />SBS <br />10 <br />4_ <br />Fly Ash, Moist <br />5- <br />6- <br />5 <br />N <br />3 <br />SBS <br />12 <br />7- <br />V <br />Wet @ 7.5 feet <br />8- <br />3 <br />Y <br />4 <br />SBS <br />10 <br />9- <br />10 <br />11- <br />(10' -15') Black- Brown, Fabric Peat (Pt) <br />with Organic Silt (OL) Lenses, Wet <br />Organic Sediments <br />2 <br />Y <br />5 <br />SBS <br />11 <br />12- <br />13- <br />1 <br />Y <br />6 <br />SBS <br />0 <br />14- <br />15 <br />16- <br />16- <br />(15'- 22.5') Dark Grey, Organic Silt, (OL- <br />Wet, Very Loose <br />Glacial Outwash <br />WH <br />Y <br />7 <br />SBS <br />0 <br />. 17- <br />18- <br />2 <br />Y <br />8 <br />SBS <br />12 <br />19- <br />20- <br />WEATHER: Clear <br />21- <br />Continue <br />4 <br />Y <br />9 <br />SBS <br />14 <br />TEMP: 90° <br />WATER LEVEL MEASUREMENTS DRILLING DATA <br />DATE <br />TIME (HRS) <br />SAMPLED <br />DEPTH <br />CASING <br />DEPTH <br />CAVE -IN <br />DEPTH <br />UKILLINO <br />MUD <br />LEVEL <br />WATER LEVEL <br />BR <br />07/26/07 <br />2:30 <br />41.5' <br />40' <br />N/A <br />N/A <br />None BCR <br />METHOD: 3 1/4" HAS <br />07/26/07 <br />3:00 <br />17' <br />N/A <br />8.0' ACR <br />2" OD SBS <br />F -350 / CME 45B <br />BORING COMPLETED: 07/26/07 <br />- 2 6 - <br />