My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2007 Council Agenda
>
City Council Packets
>
2000-2009
>
2007
>
10-10-2007 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2011 2:37:06 PM
Creation date
12/21/2011 2:31:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Check Fee <br />State Surcharge <br />Up to 65% of the calculated permit fee <br />.0005 x the value of the job (minimum surcharge is 50¢) <br />• Plan review fees for similar building plans = 25% of normal building permit fee. <br />• Work commencing before permit issuance — 100% of normal building permit fee. <br />• Fee refunds — upon written application not more than 80% of building permit fee <br />and 80% of plan review fee when plans are withdrawn or cancelled before review <br />is done. <br />▪ Inspections outside of normal business hours = $50.50 per hour (minimum of two <br />hours). <br />• Sod escrow (if turf is not established at time of occupancy) = $2,000.00 <br />Electrical Permit Fees (Effective January 2, 2006): <br />All Services Circuits and Feeders <br />0 -300 amp $50 <br />400 amp $58 <br />500 amp $72 <br />600 amp $86 <br />800 amp $114 <br />1000 amp $142 <br />1100 amp $156 <br />1200 amp $170 <br />Add $14 for each additional 100 amps <br />Minimum Fee: <br />Maximum Fee: <br />Apartment Buildings: <br />Swimming Pools: <br />Traffic Signals: <br />Street Lighting: <br />Transformers /Generators: <br />Retro Fit Lighting: <br />Sign Transformer: <br />0 -30 amp $7 <br />31 -100 amp $10 <br />101 -200 amp $15 <br />300 amp $20 <br />400 amp $25 <br />500 amp $30 <br />600 amp $35 <br />700 amp $40 <br />Add $5 for each additional 100 amps <br />Minimum permit fee is $27 plus 500 state <br />surcharge. This is for one inspection only. <br />Minimum fee for rough -in inspection and <br />final is $54 plus 500 state surcharge. <br />Maximum fee for single family dwelling not <br />over 200 amps is $150 plus 50¢ state <br />surcharge. Maximum of 2 rough -ins and one <br />final inspection. <br />Maximum fee per unit of an apartment or <br />condominium complex is $60. This does <br />not cover service and house wiring. A <br />separate permit must be issued for house <br />wiring. <br />$27 per inspection + circuits <br />$4 for each standard <br />$3 for each standard <br />$8 /unit + 40¢ for each KVA up to 100 KVA <br />+ 300 for each KVA above 100 KVA <br />40¢ per fixture <br />$7 first 500 VA + 70¢ for each additional <br />100 VA <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.