My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2007 Council Agenda
>
City Council Packets
>
2000-2009
>
2007
>
10-10-2007 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2011 2:37:06 PM
Creation date
12/21/2011 2:31:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Residential <br />Minimum Fee <br />Furnace <br />Air Conditioning & Refrigeration <br />Air Exchanger w/ Duct Work <br />Gas Fireplace <br />Mobile Home Connection <br />Radiant Floor Heat <br />Duct Work <br />Gas Line <br />Gas Direct Vent Heater <br />Gas or Oil Space Heater <br />Furnace (wood burning) <br />Replacement of Water Heater <br />Swimming Pool Heater <br />State Surcharge <br />$25.00 <br />$75.00 —New <br />$50.00 — Replacement <br />$25.00 — Unit heaters <br />$45.00 — New <br />$25.00 — Replacement <br />$35.00 <br />$35.00 per unit <br />$35.00 <br />$35.00 <br />$30.00 <br />$25.00 <br />$25.00 per unit <br />$25.00 per unit <br />$30.00 per unit <br />$30.00 <br />$30.00 <br />50¢ <br />* Project value means the actual or estimated dollar amount charged for permitted work <br />including materials, labor, profit, and other fixed costs. It is the amount to be charged to <br />the customer for the work done. If any material, equipment, labor or installation are <br />furnished by the owner, tenant, or any other party, the reasonable market value of such <br />items must be added to the estimated cost or project value for permit fee purposes. In the <br />event that there is a dispute on the amount of the job cost, the city may request the <br />submission of a signed copy of the actual contract. <br />Plumbing Permit Fees <br />Outside Sewer/Water <br />Residential Water <br />Residential Sewer <br />Commercial Water <br />Commercial Sewer <br />State Surcharge <br />Inside Plumbing <br />Base Fee <br />Fixtures <br />Water Turn-on <br />Water Turn-off <br />Water Meter <br />(Effective January 1, 2006): <br />$25.00 <br />$25.00 <br />$35.00 (4" line or larger) <br />$35.00 (4" line or larger) <br />500 <br />$25.00 (charged in addition to the other <br />fees) <br />$8.00 each <br />$15.00 <br />$15.00 <br />$182.00 — 5/8" for fire sprinkler systems <br />$197.00 —' /d' for single family homes <br />$246.00 — 1" lawn sprinkler systems <br />$457.00 — 1 1/2 " <br />-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.