My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2007 Council Agenda
>
City Council Packets
>
2000-2009
>
2007
>
10-10-2007 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2011 2:37:06 PM
Creation date
12/21/2011 2:31:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX G <br />FINDINGS INCLUDING BUT /FOR QUALIFICATIONS <br />The reasons and facts supporting the findings for the adoption of the Tax Increment Financing Plan (TIF <br />Plan) for Tax Increment Financing District No. 5 -1 (District), as required pursuant to Minnesota Statutes, <br />Section 469.175, Subdivision 3 are as follows: <br />1. Finding that Tax Increment Financing District No. 5-1 is a renewal and renovation district as defined <br />in M.S., Section 469,174, Subd. 10(a)(1). <br />The District consists of 9 parcels, with plans to redevelop the area for manufacturing purposes. At more <br />than 70 percent of the area in the parcels in the District are occupied by buildings, streets, utilities, paved <br />or gravel parking lots or other similar structures and more than 20 percent of the buildings in the District <br />are structurally substandard, and more than 30 percent are requiring substantial renovation or clearance. <br />(See Appendix F of the TIF Plan.) <br />2. Finding that the proposed development, in the opinion of the City Council, would not reasonably be <br />expected to occur solely through private investment within the reasonably foreseeable future and that the <br />increased market value of the site that could reasonably be expected to occur without the use of tax <br />increment financing would be less than the increase in the market value estimated to result from the <br />proposed development after subtracting the present value of the projected tax increments for the <br />maximum duration of the District permitted by the TIF Plan. <br />The proposed development, in the opinion of the City, would not reasonably be expected to occur solely <br />through private investment within the reasonablyforeseeable future :: This finding is supported by the fact <br />that the redevelopment proposed in the TIF Plan meets the City's objectives for redevelopment. Due to <br />the high cost of redevelopment on the parcels currently occupied by substandard buildings, the limited <br />amount of manufacturing property for expansion adjacent to the existing project, the incompatible land <br />uses at close proximity, and the cost of financing the proposed improvements, this project is feasible only <br />through assistance, in part, from tax increment financing. This will also enable the City to use TIF <br />revenues to enable the future acquisition and redevelopment of the Capital View Learning Center, subject <br />to future expansion by St. Jude into this area. The developer was asked for and provided a letter as <br />justification that the developer would not have gone forward without tax increment assistance. (See <br />attachment in Appendix G of the TIF Plan.) <br />The increased market value of the site that could reasonably be expected to occur without the use of tax <br />increment financingwould be less than the increase in market value estimated to result from the proposed <br />development after subtracting the present value oftheprojected tax increments for the maximum duration <br />of the District permitted by the TIF Plan: This finding is justified on the grounds that the cost of site and <br />public improvements and utilities add to the total redevelopment cost. Historically, site and public <br />improvements costs in this area have made redevelopment infeasible without tax increment assistance. <br />The acquisition of parcels along County Road B2 for open space and road right -of -way will provide for <br />additional lane construction along County Road B2 at such time that Rice Street can accommodate that <br />type of project. This will also eliminate a blighted influence on the area and provide an opportunity for <br />landscaping improvements along B2 to beautify and screen the area. Providing for utility extensions for <br />the St. Jude project (water main and sanitary sewer) will avoid the need for a lift station for sanitary sewer <br />and will loop an existing dead -end water main off of Stephanie Court, just to the south of the St. Jude <br />project areas. This water main extension will also be needed to meet fire flows to the project as well as <br />to improve existing fire flows for all properties in this area. Improved traffic flow and safety will be <br />APPENDIX G -t <br />- 4 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.