Laserfiche WebLink
'7 -37 <br />Special Provisions <br />1. Notes to the grading plan shall be added to provide direction to the contractor on the <br />building of the infiltration basins. The notes shalt reference the need for appropriate <br />construction sequencing, onsite soil verification at time of construction, measures needed to <br />prevent compaction during construction, and erosion control measures needed until <br />adjacent areas have been stabilized. A plan for diverting flow from the basins until <br />vegetation is established shall also be provided. <br />2. The applicant shall submit to the District a copy of the approved Minnesota Pollution Control <br />Agency's NPDES Phase 2 Construction Permit. <br />3. A copy of an executed and recorded maintenance agreement for the stormwater <br />management practices on the site shall be submitted to the District. <br />