My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-2012 Council Agenda
>
City Council Packets
>
2010-2019
>
2012
>
01-23-2012 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2012 9:16:04 AM
Creation date
1/20/2012 9:15:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 Street Improvements Page 2 <br />City of Little Canada <br />EXISTING CONDITIONS <br />❑ Minor spauling or flaking of bituminous <br />❑ Pavement settling below curb inhibiting drainage <br />❑ Cracking becoming more severe. <br />PROPOSED IMPROVEMENTS <br />❑ Mill & overlay from County Road C to the south end. <br />➢ Mill 2.0" of the existing pavement and overlay <br />➢ Full depth mill areas of worst cracking that appear unsound after initial <br />milling, which will include gravel and base bituminous replacement. <br />➢ Curb and gutter replacement of severely damaged curb and curb holding <br />significant water. <br />❑ Seal coating and crack sealing of the streets was reviewed. Due to current <br />condition staff is recommending a higher level of maintenance (i.e. mill and pave) <br />to reestablish good drainage and protect the street subgrade. <br />❑ Restoration of disturbed boulevard areas can be difficult. Seed vs. Sod. <br />➢ Examples of good and poor results with both methods on City projects. <br />➢ Sod costs more, but provides "instant green" finished look. <br />➢ Both seeding and sod require extra watering and care by property owners to <br />successfully establish. Without care both will fail. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.