Laserfiche WebLink
ITEM <br />NO, <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />100 <br />525000 <br />100 <br />5250.00 <br />2 <br />4 <br />REMOVE CONCRETE SIDEWALK <br />SY <br />(0.00 <br />512.00 <br />0.00 <br />50.00 <br />15.00 <br />618000 <br />5 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />600.00 <br />6175 <br />00D <br />60.00 <br />622.00 <br />61,000.50 <br />6 <br />COMMON EXCAVATION (9) <br />CY <br />500.00 <br />516,00 <br />0.00 <br />60.00 <br />600.00 <br />69.600.00 <br />7 <br />TOPSOIL. BORROW <br />CY <br />9000 <br />636.25 <br />0.00 <br />60,00 <br />ON <br />50.00 <br />0 <br />GEOTEXT(LE FABRIC <br />SY <br />1.655.00 <br />51.35 <br />0.00 <br />50.00 <br />1,654,00 <br />52232.00 <br />9 <br />AGGREGATE BASE CLASS 5 <br />TON <br />080.00 <br />514,00 <br />0.00 <br />50.00 <br />893.07 <br />513.22020 <br />10 <br />TYPE MV4 WEAR COURSE MIXTURE <br />TON <br />170.00 <br />577.00 <br />0.00 <br />50.00 <br />211.07 <br />616,252.30 <br />11 <br />4" PERF PE PIPE DRAIN WISOCK <br />1.9 <br />125.00 <br />50.00 <br />0.00 <br />60.00 <br />107.00 <br />51,330.00 <br />12 <br />13 <br />10" (DUAL WALUHPOE STORM SEWER <br />CONNECT TO EXISTING STORM STRUCTURE <br />LE <br />EACH <br />370.00 <br />1 O <br />537.30 <br />5345.00 <br />0.00 <br />50.00 <br />374.00 <br />56.47020 <br />000 <br />50.0D <br />1.00 <br />5345.00 <br />14 <br />CONST DRAINAGE STRUCTURE DESIGN SPECIAL (27 "DNA) <br />EACH <br />300 <br />53.31500 <br />000 <br />50.00 <br />3.00 <br />59.045.00 <br />15 <br />CONST DRAINAGE STRUCTURE DESIGN 48 .4020 <br />EACH <br />100 <br />54,150.00 <br />0.00 <br />50.00 <br />1.00 <br />54,150.00 <br />16 <br />4' CONCRETE SIDEWALK <br />SF <br />70.0D <br />58.25 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />17 <br />BASKETBALL HOOP <br />LS <br />1.00 <br />53.450.00 <br />0.00 <br />50.00 <br />100 <br />53.450,00 <br />18 <br />SPORT COURT MARKING <br />LS <br />1.00 <br />54 ,85000 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />10 <br />INLET PROTECTION (WIMCO) <br />EACH <br />3.00 <br />5215.0D <br />0.00 <br />50.00 <br />30D <br />564500 <br />20 <br />EROSION CONTROL BLANKET. CATEGORY 2 <br />SY <br />110,00 <br />5440 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />21 <br />SEEDING (TYPE 270) <br />SY <br />1.15000 <br />53.45 <br />0.00 <br />50.00 <br />0.00 <br />50,00 <br />SCHEDULE 6.0- TNUNDERBAY PARK • TOTAL 50.00 573,414.27 <br />SCHEDULE 6.0 - ALTERNATE COMPLETION DATE <br />t <br />SCHEDULE 1.0 COMPLETION EXTENSION <br />LS <br />1.00 <br />5250.00 <br />100 <br />525000 <br />100 <br />5250.00 <br />2 <br />SCHEDULE 2.0 COMPLETION EXTENSION <br />LS <br />1.00 <br />5150.00 <br />0.00 <br />50.00 <br />000 <br />5000 <br />3 <br />SCHEDULE 3.0 COMPLETION EXTENSION <br />(.S <br />100 <br />5400.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />4 <br />SCHEDULE 4.0 COMPLETION EXTENSION <br />(.S <br />1 00 <br />5740.00 <br />0.50 <br />5370.00 <br />0.50 <br />6370.00 <br />5 <br />SCHEDULE 5.0 COMPLETION EXTENSION <br />LS <br />1.00 <br />8025.00 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />SCHEDULE 6.0- ALTERNATE COMPLETION DATE - TOTAL 5620.00 5620.00 <br />RIO SUMMARY <br />SCHEDULE 1.0- WATERWORKS TRAIL - TOTAL <br />SCHEDULE 20 - SPOONER PARK - TOTAL <br />SCHEDULE 3.0 - VALENTO LANE - TOTAL <br />SCHEDULE 4.0 - PIONEER PARK - TOTAL <br />SCHEDULE 5.0 . TMUNOEROAY PARK - TOTAL <br />SCHEDULE 6.0 - ALTERNATE COMPLETION DATE • TOTAL <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID $UMMARY TO DATE <br />THIS PERIOD <br />TOTAI. TO DATE <br />50.00 513,059,02 <br />50.00 50.00 <br />50.00 56,545.44 <br />50.00 557,903.21 <br />80.00 573,414.27 <br />5620.00 5020.00 <br />5620.00 <br />5152,232.83 <br />3 <br />TOTAL THIS PERIOD <br />TOTAL TO DATE <br />AMOUNT EARNED <br />5620.00 <br />5)52,232.83 <br />AMOUNT RETAINED <br />- 57,58004 <br />5000 <br />MATERIAI. ON SITE <br />50.00 <br />50.00 <br />MATERIAL DEDUCT. <br />50.00 <br />50.00 <br />PREVIOUS PAYMENTS <br />5144,032.19 <br />AMOUNT DUE <br />8820004 <br />5820064 <br />3 <br />