My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-2006 Council Agenda
>
City Council Packets
>
2000-2009
>
2006
>
08-23-2006 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2012 1:31:29 PM
Creation date
3/19/2012 1:25:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM: <br />TO: <br />CONTRACTOR: <br />ADDRESS: <br />OWNER: <br />PROJECT: <br />ORIGINAL: <br />REVISED: <br />PARTIAL PAY ESTIMATE 42 (FINAL) <br />July 2, 2006 <br />August 15, 2006 <br />O' MALLEY CONSTRUCTION, INC. <br />35799 241ST AVENUE, LE CENTER, MN 56057 <br />CITY OF LITTLE CANADA <br />2006 SIDEWALK IMPROVEMENTS <br />COMPLETION DATE <br />June 30, 2006 <br />AMOUNT OF CONTRACT <br />ORIGINAL: $80,990.23 <br />REVISED: <br />ITEM <br />NO. <br />ITEM DESCRIPTION. <br />UNIT <br />ORIGINAL CONTRACT <br />QTY. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />QTY. TOTAL PRICE <br />SCHEDULE 1.0 - COUNTRY DRIVE CONNECTION <br />1 <br />MOBILIZATION <br />LS <br />1.00 <br />$1,000.00 <br />0.00 <br />$0.00 <br />1.00 <br />$1,000.00 <br />2 <br />CLEAR <br />EACH <br />3.00 <br />$296.43 <br />0.00 <br />$0.00 <br />2.00 <br />$592.86 <br />3 <br />GRUB <br />EACH <br />48.00 <br />$2.57 <br />0.00 <br />$0.00 <br />23.00 <br />$59.11 <br />4 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />175.00 <br />$6.52 <br />0.00 <br />$0.00 <br />180.00 <br />$1,173.60 <br />5 <br />REMOVE FLARED END SECTION <br />EACH <br />3.00 <br />$296.43 <br />0.00 <br />$0.00 <br />3.00 <br />$889.29 <br />6 <br />REMOVE EXISTING STORM PIPE <br />LF <br />75.00 <br />$23.97 <br />0.00 <br />$0.00 <br />75.00 <br />$1,797.75 <br />7 <br />SALVAGE SIGN <br />EACH <br />1.00 <br />$35.95 <br />0.00 <br />$0.00 <br />3.00 <br />$707.85 <br />8 <br />COMMON BORROW <br />CY <br />650.00 <br />$6.78 <br />413.00 <br />$2,800.74 <br />1493.00 <br />$10,122.54 <br />9 <br />SITE GRADING <br />LS <br />1.00 <br />$3,466.80 <br />0.00 <br />$0.00 <br />1.00 <br />$3,466.80 <br />10 <br />TOPSOIL BORROW <br />CY <br />250.00 <br />$13.68 <br />0.00 <br />$0.00 <br />214.00 <br />$2,927.52 <br />11 <br />DRIVEWAY PATCH (3" BIT, 6" CLASS 5) <br />SF <br />385.00 <br />$6.04 <br />0.00 <br />$0.00 <br />1544.00 <br />$9,325.76 <br />12 <br />4" CONCRETE SIDEWALK <br />SF <br />3,450.00 <br />$2.79 <br />0.00 <br />$0.00 <br />3767.00 <br />$10,509.93 <br />13 <br />24" HDPE STORM SEWER <br />LF <br />343.00 <br />$27.50 <br />0.00 <br />$0.00 <br />370.00 <br />$10,175.00 <br />I 14 <br />24" HDPE FLARED END SECTION <br />EACH <br />1.00 <br />$275.00 <br />0.00 <br />$0.00 <br />1.00 <br />$275.00 <br />15 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />1.00 <br />$550.00 <br />0.00 <br />$0.00 <br />1.00 <br />$550.00 <br />16 <br />CONST DRAINAGE STRUCTURE DESIGN 48 -4020 <br />EACH <br />3.00 <br />$2,200.00 <br />0.00 <br />$0.00 <br />3.00 <br />36,600.00 <br />17 <br />RANDOM RIP RAP CLASS IV <br />TON <br />50.00 <br />$62.67 <br />0.00 <br />$0.00 <br />47.00 <br />$2,945.49 <br />18 <br />RAISE SANITARY MH <br />EACH <br />1.00 <br />$275.00 <br />0.00 <br />$0.00 <br />1.00 <br />$275.00 <br />19 <br />CURB STOP EXTENSION <br />EACH <br />1.00 <br />$132.08 <br />0.00 <br />$0.00 <br />1.00 <br />$132.08 <br />20 <br />INSTALL SALVAGED SIGN <br />EACH <br />1.00 <br />$34.67 <br />0.00 <br />$0.00 <br />3.00 <br />$104.01 <br />21 <br />RELOCATE IRRIGATION CONTROL BOX <br />EACH <br />1.00 <br />$513.60 <br />0.00 <br />30,00 <br />0.00 <br />$0.00 <br />22 <br />INLET PROTECTION <br />EACH <br />3.00 <br />$152.33 <br />2.00 <br />$304.66 <br />2.00 <br />$304.66 <br />23 <br />SILT FENCE TYPE MACHINE SLICED <br />LF <br />170.00 <br />$2.83 <br />0.00 <br />$0.00 <br />207.00 <br />$585.81 <br />SCHEDULE 1.0- COUNTRY DRIVE CONNECTION -- TOTAL $3,104.80 $63,920.06 <br />SCHEDULE 2.0 - MARKET PLACE POND <br />1 <br />MOBILIZATION <br />LS <br />1.00 <br />$1,000.00 <br />0.00 <br />$0.00 <br />1.00 <br />$1,000.00 <br />2 <br />SITE GRADING <br />LS <br />1.00 <br />$2,000.00 <br />0.00 <br />$0.00 <br />1.00 <br />$2,000.00 <br />3 <br />CONCRETE SIDEWALK <br />SF <br />4,350.00 <br />$2.79 <br />0.00 <br />$0.00 <br />4254.00 <br />$11,868.66 <br />SCHEDULE 2.0 - MARKET PLACE POND -- TOTAL $0.00 $14,868.66 <br />SCHEDULE 3.0 - LITTLE CANADA ROAD <br />1 <br />MOBILIZATION <br />LS <br />1.00 <br />$1,000.00 <br />0.00 <br />$0.00 <br />1.00 <br />$1,000.00 <br />2 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />375.00 <br />$4.55 <br />0.00 <br />$0.00 <br />400.00 <br />$1,820.00 <br />3 <br />REMOVE CONCRETE SIDEWALK <br />SF <br />500.00 <br />$1.00 <br />191.00 <br />$191.00 <br />191.00 <br />$191.00 <br />4 <br />REMOVE CONCRETE CURB & GUTTER <br />LF <br />65.00 <br />$4.98 <br />0.00 <br />$0.00 <br />80.00 <br />$398.40 <br />5 <br />CONCRETE CURB & GUTTER <br />LF <br />65.00 <br />$19.60 <br />0.00 <br />$0.00 <br />80.00 <br />$1,568.00 <br />6 <br />4" CONCRETE SIDEWALK <br />SF <br />3,600.00 <br />$2.79 <br />469.00 <br />$1,364.31 <br />3600.00 <br />$10,044.00 <br />a SCHEDULE 3.0- LITTLE CANADA ROAD - TOTAL 31,555.31 $15,021.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.