My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-20-2006 Council Agenda
>
City Council Packets
>
2000-2009
>
2006
>
12-20-2006 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2014 3:26:29 PM
Creation date
3/19/2012 2:45:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum <br />ASSO(IAT. <br />'RU 1101114 <br />TO: Little Canada Mayor and City Council Members <br />FROM: Lee Elfering, City Engineer <br />DATE: December 13, 2006 <br />RE: County Road B2 & Jessica Court Lift Station Modifications <br />Change Order #1 <br />Background <br />The City let two contracts for the above referenced project earlier this fall. One project <br />was to supply the lift station equipment and the second contract was to install the <br />supplied equipment. At the time the installation contract was being let the successful <br />equipment supplier provided an estimated delivery time for the lift station equipment. <br />The estimated date provided and included in the specification was at or around <br />November 20, 2006. Based on that estimated equipment delivery date the time set for <br />substantial completion of the installations of both lift stations was January 30, 2007. <br />After award of the installation contract it was discovered that some components of the lift <br />stations were in short supply and on back order. Hence the estimated delivery date for <br />one of the lift stations could be met, but the other station's equipment would not be <br />complete for delivery until early January. Due to the extended delivery time Engineering <br />& Construction Innovations, Inc, the installation Contractor, has requested an extension <br />of the substantial completion time on the second lift station until March 2, 2007. <br />Summary and Recommendations <br />The delay of the equipment delivery was beyond the control of the installation Contractor <br />and a time extension is justified. We have prepared the attached Change Order which <br />extends the substantial completion time for the Jessica Court lift station to March 2, <br />2007. All other completion dates will remain the same and there will be no additional <br />compensation beyond the time extension. We would recommend approval of Change <br />Order Number 1 granting an extension of the substantial completion date for the Jessica <br />Court lift station to March 2, 2007, <br />If you have any questions or would like to discuss this issue please feel free to call me at <br />(763) 780 -0450. <br />Z: \PROJ \120063E - 2006 Lift Station Modifications \0071 - Install \Change Orders \Memo - 121306 -CC (C0 #1),doc <br />10062 Flanders Court NE — Blaine, MN 55449 — (763) 780 -0450 fax (763) 780 -0452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.