My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-20-2006 Council Agenda
>
City Council Packets
>
2000-2009
>
2006
>
12-20-2006 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2014 3:26:29 PM
Creation date
3/19/2012 2:45:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey - Washington Metro <br />Watershed District <br />2665 Noel Little Canada, MN MN 55117 PERMIT <br />(651) 792 -7950 <br />Pursuant to the Rules and Regulations of the Ramsey - Washington Metro Watershed District policies and standards, and <br />based upon the statements and information contained in the permit application, letter, maps, and plans submitted by the <br />applicant and other supporting data, all of which are made a part hereof by reference, permission is hereby granted to the <br />applicant named below to conduct the grading, filling, and /or drainage activity described below: <br />06 -25 <br />this Permit is granted subject to the following GENERAL and SPECIAL PROVISIONS <br />General Provisions <br />1. Construction shall be in accordance with the plans submitted to the District as part of the record for this <br />project. <br />The site soil erosion and sediment control facilities shall be installed and maintained to conform with the <br />standards specified in the RAMSEY COUNTY EROSION AND SEDIMENT CONTROL HANDBOOK. <br />3. The site soil erosion and sediment control facilities for rough grading phase of the project must be installed <br />prior to any site grading operation. The District's Technician must be notified once these facilities are <br />installed. Grading operation shall not begin until the District Technician approves the installed facilities. <br />I. All grading operations shall be conducted in a manner to minimize the potential for site erosion. <br />5. In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and <br />intakes) the erosion control facilities shall be backed by a stabilization structure to protect those facilities <br />from the concentrated flows. The stabilization structures, such as snow fence, shall be approved by the <br />District Technician. <br />Any damaged silt fence or other erosion control facility shall be restored to their originally installed condition <br />daily. <br />All areas disturbed during construction shall be restored as soon as possible. Any areas that have been <br />finish graded and areas that have been disturbed, but have no active grading, shall be seeded and mulched <br />within 14 days. All mulch material shall be disced into the soil in a direction perpendicular to the stormwater <br />flow over such areas. Slopes 3:1 or steeper must be either seeded and covered with an erosion blanket <br />product or mulched with a tackifying agent rather than discing the mulch. <br />Project Name <br />G.R. Johnson Addition to Little Canada <br />Applicant Name Applicants Company <br />Patrick Johnson <br />Telephone Number <br />651- 484 -8192 <br />Applicants Address City <br />3046 Labore Road Little Canada <br />State Zip Code <br />MN 55109 <br />Authorized to Complete project perplans and special provisions. <br />Purpose of Permit <br />Single Family Residential <br />Expire Date of Permit <br />9/26/2007 <br />Property Description <br />3046 Labore Road, Little Canada <br />County <br />Ramsey <br />this Permit is granted subject to the following GENERAL and SPECIAL PROVISIONS <br />General Provisions <br />1. Construction shall be in accordance with the plans submitted to the District as part of the record for this <br />project. <br />The site soil erosion and sediment control facilities shall be installed and maintained to conform with the <br />standards specified in the RAMSEY COUNTY EROSION AND SEDIMENT CONTROL HANDBOOK. <br />3. The site soil erosion and sediment control facilities for rough grading phase of the project must be installed <br />prior to any site grading operation. The District's Technician must be notified once these facilities are <br />installed. Grading operation shall not begin until the District Technician approves the installed facilities. <br />I. All grading operations shall be conducted in a manner to minimize the potential for site erosion. <br />5. In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and <br />intakes) the erosion control facilities shall be backed by a stabilization structure to protect those facilities <br />from the concentrated flows. The stabilization structures, such as snow fence, shall be approved by the <br />District Technician. <br />Any damaged silt fence or other erosion control facility shall be restored to their originally installed condition <br />daily. <br />All areas disturbed during construction shall be restored as soon as possible. Any areas that have been <br />finish graded and areas that have been disturbed, but have no active grading, shall be seeded and mulched <br />within 14 days. All mulch material shall be disced into the soil in a direction perpendicular to the stormwater <br />flow over such areas. Slopes 3:1 or steeper must be either seeded and covered with an erosion blanket <br />product or mulched with a tackifying agent rather than discing the mulch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.