Laserfiche WebLink
xiii. Bankfull discharge rate (1.5 year recurrence interval) of creek <br />or stream if there is a waterway on the site or if the site <br />discharges directly to the waterway. <br />c. Proposed Conditions - A complete site plan and specifications, <br />signed by the person who designed the plan shalt be drawn to an <br />easily legible scale, shall be clearly labeled with a north arrow and <br />a date of preparation, and shall include, at a minimum, the <br />following information: <br />i. Project map — An 8.5 by 11 inch United States Geological <br />Survey (USGS) 7.5 minute quad or equivalent map <br />indicating site boundaries, proposed elevations, and areas <br />not to be disturbed; <br />ii. Property lines and lot dimensions of plat. <br />iii. The dimensions and setbacks of all buildings and <br />easements. <br />iv. The location and area of all proposed impervious surfaces <br />including public and private roads, interior roads, <br />driveways, parking lots, pedestrian ways, and rooftops. <br />Show all traffic patterns and types of paving and surfacing <br />materials. <br />v. Location, size, and approximate grade of proposed public <br />sewer and water mains. <br />vi. Elevations, sections, profiles, and details as needed to <br />describe all natural and artificial features of the project. <br />vii. Identify all natural and artificial water features on site and <br />within 1/2 mile of project boundary, including, but not <br />limited to lakes, ponds, streams (including intermittent <br />streams), and ditches. Show ordinary high water marks of all <br />navigable waters, 100 -year flood elevations and delineated <br />wetland boundaries, if any. If not available appropriate flood <br />zone determination or wetland delineation, or both, may be <br />required at the applicant's expense. <br />viii. Hydrologic calculations for volume runoff, velocities, and <br />peak flow rates by watershed, for the 2.0 -yr, 10 -yr, and 100 - <br />yr 24 -hour storm events. These shall include: <br />• Post construction peak flow rates with no detention. <br />• Post construction peak flow rates with detention. <br />• Assumed runoff curve numbers. <br />• Time of concentration used in calculations. <br />• If a flood insurance study has been done by the <br />National Flood Insurance Program, the 100 -year flood <br />elevation with and without the floodway. <br />ix. Hydrologic calculations for retaining,)0% total suspended <br />solids removal from the runoff generated by a NURP water <br />quality storm (2.5" rainfall)., <br />Model Stonnwater Ordinance Page 4 NEMO Ordinance Project <br />8 <br />Deleted: soil particles greater than 5 <br />microns <br />Deleted: (80% reduction) for new <br />construction sites and greater than 20 <br />microns (40% reduction) for <br />redevelopment sites resulting from a one- <br />year 24 -hour storm event. <br />