|
55 2506.522 INSTALL NEW FRAME AND RING CASTING
<br />56 2506.602 RECONSTRUCT DRAINAGE STRUCTURE
<br />57 2511.502 RANDOM RIP RAP CL IV
<br />58 2521.501 4" CONCRETE WALK
<br />59 2521.511 2' BITUMINOUS WALK
<br />60 2531.501 8618 CURB AND GUTTER
<br />61 2531.507 6" CONCRETE DRIVEWAY PAVEMENT
<br />62 2531.602 CONCRETE PEDESTRIAN RAMP
<br />63 2540.602 NSTALL SALVAGED MAILBOX
<br />64 2540.602 NSTALL SALVAGED GUARD POST
<br />65 2540.602 NSTALL SALVAGED FLAG POLE
<br />66 2540.602 NSTALL SALVAGED SIGN
<br />67 2540.603 NSTALL SALVAGED RETAINING WALL
<br />68 2540.603 NSTALL SALVAGED FENCE
<br />69 2557.501 WIRE FENCE DESIGN 60 -9322
<br />70 2563.601 TRAFFIC CONTROL
<br />71 2564.536 FURNISH AND INSTALL SIGN
<br />72 2564.602 PAVEMENT MESSAGE (LEFT ARROW) - EPDXY
<br />73 2564.602 PAVEMENT MESSAGE (RIGHT ARROW) - EPDXY
<br />74 2564.602 PAVEMENT MESSAGE (THRU ARROW) - EPDXY
<br />75 2564.602 PAVEMENT MESSAGE (RIGHT THRU ARROW) - EPDXY
<br />76 2564.602 PAVEMENT MESSAGE (RR CROSSING) - EPDXY
<br />77 2564.603 4" DOUBLE SOLID LINE YELLOW -EPDXY
<br />78 2564.603 4" SOLID LINE WHITE -EPDXY
<br />79 2564.603 4" SKIP LINE YELLOW -EPDXY
<br />80 2564.603 4' SOLID LINE YELLOW -EPDXY
<br />81 2564.603 24" STOP LINE WHITE - EPDXY
<br />82 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT
<br />83 2564.603 4" SOLID LINE WHITE -PAINT
<br />84 2564.603 4" SKIP LINE YELLOW -PAINT
<br />85 2564.603 4" SOLID LINE YELLOW -PAINT
<br />86 2564.603 24" STOP LINE WHITE - PAINT
<br />87 2565.602 LOOP DETECTOR
<br />88 2565.602 HANOHOLE
<br />89 2565.603 NON-METALLIC CONDUIT
<br />90 2573.502 SILT FENCE TYPE MACHINE SLICED
<br />91 2573.530 INLET PROTECTION
<br />92 2564.602 POLY PREFORM CROSS WALK
<br />SCHEDULE 5.0 • COUNTY ROAD 132 - -TOTAL
<br />EACH 6.00 5650.00 0.00 30.00 6.00
<br />EACH 2.00 5800.00 0.00 50.00 1.00
<br />TONS 55.00 355.00 0.00 50.00 33.56
<br />SF 24,300.00 52.81 5,813.26 316,335.26 22,663.26
<br />SF 2,400.00 51.70 0.00 50.00 3,630.00
<br />LF 8,100.00 57.90 44.00 $347.60 8,936.00
<br />SY 210.00 538.00 75.80 52,880.40 313.00
<br />EACH 16.00 5400.00 11.00 54,400.00 20.00
<br />EACH 3.00 570.00 0.00 60.00 3.00
<br />EACH 5.00 5250.00 0.00 $0.00 0.00
<br />EACH 2.00 $300.00 0.00 50.00 2.00
<br />EACH 2.00 595.00 0.00 50.00 2.00
<br />LF 10.00 575.00 0.00 50.00 17.00
<br />LF 20.00 520.00 0.00 $0.00 15.00
<br />LF 1,700.00 $9.66 0.00 $0.00 1,365.00
<br />LS 1.00 64,900.00 0.20 5980.00 1.00
<br />EACH 51.00 5137.25 0.00 50.00 53.00
<br />EACH 52.00 555.00 0.00 50.00 48.00
<br />EACH 2.00 $55.00 0.00 30.00 2.00
<br />EACH 2.00 $55.00 0.00 $0.00 2.00
<br />EACH 2.00 590.00 0.00 50.00 0.00
<br />EACH 2.00 5295.00 0.00 $0.00 2.00
<br />LF 560.00 50.58 0.00 30.00 432.00
<br />LF 650.00 30.38 0.00 $0.00 433.00
<br />LF 1,460.00 50.29 0.00 50.00 1,330.00
<br />LF 7,160.00 $0.29 0.00 $0.00 6,802.00
<br />LF 116.00 33.75 0.00 50.00 51.00
<br />LF 560.00 30.48 0.00 60.00 513.00
<br />LF 650.00 30.23 0.00 50.00 470.00
<br />LF 1,460.00 30.24 0.00 50.00 1.440.00
<br />LF 7,160.00 30.24 0.00 $0.00 7,100.00
<br />LF 116.00 32.78 0.00 $0.00 86.00
<br />EACH 15.00 5775.00 0.00 50.00 17.00
<br />EACH 4.00 6650.00 0.00 50.00 3.00
<br />LF 300.00 32.95 0.00 50.00 300.00
<br />LF 2,775.00 31.75 0.00 $0.00 100.00
<br />EACH 50.00 $100.00 0.00 $0.00 42.00
<br />SF 180.00 318.06 0.00 $0.00 180.00
<br />$3,900.00
<br />5800.00
<br />51,845.80
<br />563,683.76
<br />$6,171.00
<br />570,594.40
<br />311,894.00
<br />38,000.00
<br />3210.00
<br />30.00
<br />3600.00
<br />3190.00
<br />31,275.00
<br />3300.00
<br />313,185.90
<br />34,900.00
<br />$7,274.25
<br />32,640.00
<br />3110.00
<br />3110.00
<br />30.00
<br />3590.00
<br />3250.56
<br />3164.54
<br />$385.70
<br />31,972.58
<br />3191.25
<br />$246.24
<br />$108.10
<br />3345.60
<br />31,704.00
<br />$239.08
<br />513,175.00
<br />$1,950.00
<br />3885.00
<br />3175.00
<br />34,200.00
<br />33,250.80
<br />5102,264.87 31,120,318.64
<br />SCHEDULE 6.0 • CHANGE ORDER 41
<br />1 SPEC TWO ADDITIONAL CATCHBASINS ON NOEL DRIVE LS 1.00 34,234.58 0.00 $0.00 1.00 34,234.58
<br />2 SPEC ADDITION OF YARD INLET ON CARLA LANE LS 1.00 53,345.00 0.00 $0.00 1.00 33,345.00
<br />3 SPEC SCHOOL FENCE ADDITIONS LS 1.00 55.509.35 0.00 $0.00 1.00 $5,509.35
<br />4 SPEC WALL / PLANTER MODIFICATIONS AT GERVAIS MILL PARK LS 1.00 51.430.00 0.00 50.00 1.00 $1,430.00
<br />5 SPEC CHANGE TO 44" X 27' ARCH OUTLET PIPE 011 CTY. RD. B2 LS 1.00 $18,057.64 0.00 50.00 1.00 518,057.64
<br />SCHEDULE 6.0- CHANGE ORDER #1- -TOTAL
<br />O: /Pro(1816600J100711Partlal Payments /Pay Estimate 68 (2005 Project) 4
<br />5
<br />50.00 332.576,57
<br />CONTRACT ITEMS
<br />THIS PERIOD
<br />TOTAL TO DATE
<br />ITEM
<br />SPEC.
<br />NO.
<br />REF.
<br />DESCRIPTION
<br />UNIT
<br />QTY.
<br />UNIT
<br />QTY. AMOUNT
<br />QTY. AMOUNT
<br />PRICE
<br />55 2506.522 INSTALL NEW FRAME AND RING CASTING
<br />56 2506.602 RECONSTRUCT DRAINAGE STRUCTURE
<br />57 2511.502 RANDOM RIP RAP CL IV
<br />58 2521.501 4" CONCRETE WALK
<br />59 2521.511 2' BITUMINOUS WALK
<br />60 2531.501 8618 CURB AND GUTTER
<br />61 2531.507 6" CONCRETE DRIVEWAY PAVEMENT
<br />62 2531.602 CONCRETE PEDESTRIAN RAMP
<br />63 2540.602 NSTALL SALVAGED MAILBOX
<br />64 2540.602 NSTALL SALVAGED GUARD POST
<br />65 2540.602 NSTALL SALVAGED FLAG POLE
<br />66 2540.602 NSTALL SALVAGED SIGN
<br />67 2540.603 NSTALL SALVAGED RETAINING WALL
<br />68 2540.603 NSTALL SALVAGED FENCE
<br />69 2557.501 WIRE FENCE DESIGN 60 -9322
<br />70 2563.601 TRAFFIC CONTROL
<br />71 2564.536 FURNISH AND INSTALL SIGN
<br />72 2564.602 PAVEMENT MESSAGE (LEFT ARROW) - EPDXY
<br />73 2564.602 PAVEMENT MESSAGE (RIGHT ARROW) - EPDXY
<br />74 2564.602 PAVEMENT MESSAGE (THRU ARROW) - EPDXY
<br />75 2564.602 PAVEMENT MESSAGE (RIGHT THRU ARROW) - EPDXY
<br />76 2564.602 PAVEMENT MESSAGE (RR CROSSING) - EPDXY
<br />77 2564.603 4" DOUBLE SOLID LINE YELLOW -EPDXY
<br />78 2564.603 4" SOLID LINE WHITE -EPDXY
<br />79 2564.603 4" SKIP LINE YELLOW -EPDXY
<br />80 2564.603 4' SOLID LINE YELLOW -EPDXY
<br />81 2564.603 24" STOP LINE WHITE - EPDXY
<br />82 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT
<br />83 2564.603 4" SOLID LINE WHITE -PAINT
<br />84 2564.603 4" SKIP LINE YELLOW -PAINT
<br />85 2564.603 4" SOLID LINE YELLOW -PAINT
<br />86 2564.603 24" STOP LINE WHITE - PAINT
<br />87 2565.602 LOOP DETECTOR
<br />88 2565.602 HANOHOLE
<br />89 2565.603 NON-METALLIC CONDUIT
<br />90 2573.502 SILT FENCE TYPE MACHINE SLICED
<br />91 2573.530 INLET PROTECTION
<br />92 2564.602 POLY PREFORM CROSS WALK
<br />SCHEDULE 5.0 • COUNTY ROAD 132 - -TOTAL
<br />EACH 6.00 5650.00 0.00 30.00 6.00
<br />EACH 2.00 5800.00 0.00 50.00 1.00
<br />TONS 55.00 355.00 0.00 50.00 33.56
<br />SF 24,300.00 52.81 5,813.26 316,335.26 22,663.26
<br />SF 2,400.00 51.70 0.00 50.00 3,630.00
<br />LF 8,100.00 57.90 44.00 $347.60 8,936.00
<br />SY 210.00 538.00 75.80 52,880.40 313.00
<br />EACH 16.00 5400.00 11.00 54,400.00 20.00
<br />EACH 3.00 570.00 0.00 60.00 3.00
<br />EACH 5.00 5250.00 0.00 $0.00 0.00
<br />EACH 2.00 $300.00 0.00 50.00 2.00
<br />EACH 2.00 595.00 0.00 50.00 2.00
<br />LF 10.00 575.00 0.00 50.00 17.00
<br />LF 20.00 520.00 0.00 $0.00 15.00
<br />LF 1,700.00 $9.66 0.00 $0.00 1,365.00
<br />LS 1.00 64,900.00 0.20 5980.00 1.00
<br />EACH 51.00 5137.25 0.00 50.00 53.00
<br />EACH 52.00 555.00 0.00 50.00 48.00
<br />EACH 2.00 $55.00 0.00 30.00 2.00
<br />EACH 2.00 $55.00 0.00 $0.00 2.00
<br />EACH 2.00 590.00 0.00 50.00 0.00
<br />EACH 2.00 5295.00 0.00 $0.00 2.00
<br />LF 560.00 50.58 0.00 30.00 432.00
<br />LF 650.00 30.38 0.00 $0.00 433.00
<br />LF 1,460.00 50.29 0.00 50.00 1,330.00
<br />LF 7,160.00 $0.29 0.00 $0.00 6,802.00
<br />LF 116.00 33.75 0.00 50.00 51.00
<br />LF 560.00 30.48 0.00 60.00 513.00
<br />LF 650.00 30.23 0.00 50.00 470.00
<br />LF 1,460.00 30.24 0.00 50.00 1.440.00
<br />LF 7,160.00 30.24 0.00 $0.00 7,100.00
<br />LF 116.00 32.78 0.00 $0.00 86.00
<br />EACH 15.00 5775.00 0.00 50.00 17.00
<br />EACH 4.00 6650.00 0.00 50.00 3.00
<br />LF 300.00 32.95 0.00 50.00 300.00
<br />LF 2,775.00 31.75 0.00 $0.00 100.00
<br />EACH 50.00 $100.00 0.00 $0.00 42.00
<br />SF 180.00 318.06 0.00 $0.00 180.00
<br />$3,900.00
<br />5800.00
<br />51,845.80
<br />563,683.76
<br />$6,171.00
<br />570,594.40
<br />311,894.00
<br />38,000.00
<br />3210.00
<br />30.00
<br />3600.00
<br />3190.00
<br />31,275.00
<br />3300.00
<br />313,185.90
<br />34,900.00
<br />$7,274.25
<br />32,640.00
<br />3110.00
<br />3110.00
<br />30.00
<br />3590.00
<br />3250.56
<br />3164.54
<br />$385.70
<br />31,972.58
<br />3191.25
<br />$246.24
<br />$108.10
<br />3345.60
<br />31,704.00
<br />$239.08
<br />513,175.00
<br />$1,950.00
<br />3885.00
<br />3175.00
<br />34,200.00
<br />33,250.80
<br />5102,264.87 31,120,318.64
<br />SCHEDULE 6.0 • CHANGE ORDER 41
<br />1 SPEC TWO ADDITIONAL CATCHBASINS ON NOEL DRIVE LS 1.00 34,234.58 0.00 $0.00 1.00 34,234.58
<br />2 SPEC ADDITION OF YARD INLET ON CARLA LANE LS 1.00 53,345.00 0.00 $0.00 1.00 33,345.00
<br />3 SPEC SCHOOL FENCE ADDITIONS LS 1.00 55.509.35 0.00 $0.00 1.00 $5,509.35
<br />4 SPEC WALL / PLANTER MODIFICATIONS AT GERVAIS MILL PARK LS 1.00 51.430.00 0.00 50.00 1.00 $1,430.00
<br />5 SPEC CHANGE TO 44" X 27' ARCH OUTLET PIPE 011 CTY. RD. B2 LS 1.00 $18,057.64 0.00 50.00 1.00 518,057.64
<br />SCHEDULE 6.0- CHANGE ORDER #1- -TOTAL
<br />O: /Pro(1816600J100711Partlal Payments /Pay Estimate 68 (2005 Project) 4
<br />5
<br />50.00 332.576,57
<br />
|