|
CONTRACT ITEMS
<br />ITEM SPEC.
<br />NO. REF. DESCRIPTION UNIT QTY. UNIT
<br />PRICE
<br />1
<br />QTY. AMOUNT I QTY. AMOUNT
<br />THIS PERIOD TOTAL TO DATE
<br />55 2506.522 INSTALL NEW FRAME AND RING CASTING EACH 6.00 5650.00 0.00 60.00 6.00 53.90000
<br />56 2506.602 RECONSTRUCT DRAINAGE STRUCTURE EACH 2.00 5800.00 0.00 50.00 1.00 $80000
<br />57 2511.502 RANDOM RIP RAP CL IV TONS 55.00 55800 0.00 50.00 33.56 51,845.80
<br />58 2521.501 4" CONCRETE WALK SF 24,300.00 52.81 0.00 50.00 16,850.00 547,34860
<br />59 2521,511 2" BITUMINOUS WALK SF 2,40000 51.70 000 50.00 3,630,00 56,171.00
<br />60 2531.501 8618 CURB AND GUTTER LF 8.100.00 57.90 0.00 50.00 8,892.00 370,246.80
<br />61 2531.507 6" CONCRETE DRIVEWAY PAVEMENT SY 21000 538.00 0.00 50.00 237.20 59,013.60
<br />62 2531.602 CONCRETE PEDESTRIAN RAMP EACH 16.00 5400.00 0.00 50.00 9,00 53.600.00
<br />63 2540.602 NSTALL SALVAGED MAILBOX EACH 3.00 570.00 0.00 50.00 3.00 5210.00
<br />64 2540.602 NSTALL SALVAGED GUARD POST EACH 5.00 8250.00 0.00 50.00 0.00 5000
<br />65 2540.602 NSTALL SALVAGED FLAG POLE EACH 2.00 5300.00 0.00 50.00 2.00 5600.00
<br />66 2540.602 NSTALL SALVAGED SIGN EACH 2.00 595.00 0.00 50.00 2.00 519000
<br />67 2540.603 NSTALL SALVAGED RETAINING WALL LF 10.00 575.00 0.00 50.00 17.00 81,275.00
<br />68 2540.603 NSTALL SALVAGED FENCE LF 20.00 $20.00 0.00 80.00 15.00 5300.00
<br />69 2557.501 WIRE FENCE DESIGN 6O -9322 LF 1,700,00 59.66 0.00 $0.00 1,365,00 513.185.90
<br />70 2563.601 TRAFFIC CONTROL LS 1.00 34,900.00 0.00 50.00 0.60 83,920.00
<br />71 2564,536 FURNISH AND INSTALL SIGN EACH 51.00 5137.25 0.00 50.00 53.00 $7,274.25
<br />72 2564602 PAVEMENT MESSAGE (LEFT ARROW) - EPDXY EACH 52,00 355.00 48,00 52,640.00 48.00 52,640.00
<br />73 2564602 PAVEMENT MESSAGE (RIGHT ARROW) - EPDXY EACH 2.00 355,00 2.00 511000 2.00 5110.00
<br />74 2564.602 PAVEMENT MESSAGE (THRU ARROW) - EPDXY EACH 2.00 555.00 2.00 5110.00 2.00 5110.00
<br />75 2564.602 PAVEMENT MESSAGE (RIGHT - THRU ARROW) - EPDXY EACH 2.00 590.00 0.00 50.00 0.00 5000
<br />76 2564.602 PAVEMENT MESSAGE (RR CROSSING) - EPDXY EACH 2.00 5295,00 2.00 559000 2.00 3590.00
<br />77 2564.603 4" DOUBLE SOLID LINE YELLOW -EPDXY LF 560.00 $0.58 432.00 5250.56 432.00 $250.56
<br />78 2564.603 4" SOLID LINE W1ITE -EPDXY LF 650.00 50.38 433.00 5164.54 433.00 5164.54
<br />79 2564.603 4" SKIP LINE YELLOW -EPDXY LF 1,460.00 50.29 1,330.00 5385.70 1,330.00 8385.70
<br />80 2564.603 4" SOLID LINE YELLOW -EPDXY LF 7,160.00 50.29 6,802.00 5197268 6,802.00 51,972.58
<br />81 2564.603 24" STOP LINE WHITE - EPDXY LF 116,00 53.75 51.00 5191.25 51.00 3191.25
<br />82 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT LF 56000 50.48 0.00 50.00 513.00 $246.24
<br />83 2564.603 4" SOLID LINE WHITE -PAINT LF 650.00 $0.23 0.00 50.00 470.00 510210
<br />84 2564.603 4" SKIP LINE YELLOW -PAINT LF 1,460.00 $0.24 0.00 6200 1,440.00 5345.60
<br />85 2564.603 4" SOLID LINE YELLOW-PAINT LF 7,16000 50.24 0.00 50.00 7,100.00 51,704.00
<br />86 2564.603 24" STOP LINE WHITE - PAINT LF 116.00 82.78 0.00 50.00 86.00 5239.08
<br />87 2565.602 LOOP DETECTOR EACH 15.00 5775.00 0.00 50.00 17.00 513.175.00
<br />88 2565.602 HANOHOLE EACH 4.00 3650.00 0.00 50.00 3.00 81,950.00
<br />89 2565603 NON - METALLIC CONDUIT LF 300.00 52.95 0.00 50.00 300.00 5885.00
<br />90 2573.502 SILT FENCE TYPE MACHINE SLICED LE 2,775.00 51.75 0.00 50.00 100.00 5175,00
<br />91 2573.530 INLET PROTECTION EACH 50.00 5100.00 0.00 50.00 42.00 54,200.00
<br />92 2564.602 POLY PREFORM CROSS WALK SF 180.00 818.06 180.00 53,250.80 180.00 53,250.60
<br />SCHEDULE 5.0 - COUNTY ROAD 32 -- TOTAL
<br />59,665.43 31,018,053.77
<br />SCHEDULE 6 0 - CHANGE ORDER 81
<br />1 SPEC TWO ADDITIONAL CATCHBASINS ON NOEL DRIVE LS 100 54,234.58 0.00 30.00 1.00 54,234.58
<br />2 SPEC ADDITION OF YARD INLET ON CARLA LANE LS 1.00 53,345.00 0.00 50.00 1.00 53,345.00
<br />3 SPEC SCHOOL FENCE ADDITIONS LS 1.00 55,509.35 000 50.00 1.00 55,50965
<br />4 SPEC WALL/ PLANTER MODIFICATIONS AT GERVAIS MILL PARK LS 1.00 $1,430.00 0.00 50.00 1.00 61 .430.00
<br />5 SPEC CHANGE TO 44 "X27" ARCH OUTLET PIPE ON CTY. RD, 82 LS 1.00 $18,057.64 0.00 50.00 1.00 518,057.64
<br />SCHEDULE 6.0- CHANGE ORDER 81- -TOTAL
<br />(1/885/8165007/0071 /Partial Payments /Pay Esllmale 87 (2005 P/aleeI(
<br />80.00 532,576.57
<br />
|