My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-22-2006 Council Agenda
>
City Council Packets
>
2000-2009
>
2006
>
03-22-2006 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2012 9:44:13 AM
Creation date
3/29/2012 9:35:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
515 Little Canada Road, Little Canada, MN 55117-1600 <br />(651) 766 -4029 / FAX: (651) 766 -4048 <br />www.ci.little- Canada.a n.us <br />MEMORANDUM <br />TO: Mayor Blesener and Members of the City Council <br />FROM: Jim Morelan, Parks & Recreation Director <br />Brad Volk, Parks Supervisor <br />Kathy Glanzer, City Clerk <br />DATE: March 8, 2006 <br />RE: Budget Amendment — Old Fire Hall Upgrades <br />MAYOR <br />Bill Biesener <br />COUNCIL <br />Jim LaVaile <br />Rick Montour <br />Barbara Allan <br />John Keis <br />ADMINISTRATOR <br />Joel R. Hanson <br />As you know, the City has been renting out the basement of the Old Fire Hall for a <br />number of years to residents of the City. There have been very limited upgrades to this <br />space over the past several years, and the facility is in need of a few improvements. <br />Staff has reviewed the space and has concluded that the cabinets, counter top, and sink <br />need replacement as does the flooring in the kitchen and serving area. Additionally, it is <br />felt new appliances are needed. Based on this conclusion, the following pricing has been <br />obtained: <br />Cabinets and Countertop: <br />Schreier Cabinets $5,730 plus tear -out of existing cabinets <br />Cabinets by Greg $4,300 includes tear -out <br />Tile Floor (includes tear -out) <br />Abbe Floor $2,348 <br />Floors by Becker $2,575 <br />Appliance Replacement $2,000 estimate <br />One six - burner stove (replacing two four - burner stoves) <br />Refrigerator <br />Minor sheetrock repair and painting — to be done by prison crew <br />Paint and Supplies $500 estimate <br />New sink and faucet $1,200 estimate <br />Based upon the above pricing and estimates, it would be staff's recommendation that the <br />2006 Capital Improvement Budget be amended to include the above upgrades at the Old <br />Fire Hall ($10,575 estimate). The current budget amount is $2,500. It is hoped that this <br />work can be completed over the course of the summer. Every attempt will be made to <br />minimize the impact on hall rentals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.