|
55 2506.522 INSTALL NEW FRAME AND RING CASTING
<br />56 2506.602 RECONSTRUCT DRAINAGE STRUCTURE
<br />57 2511.502 RANDOM RIP RAP CL IV
<br />58 2521.501 4" CONCRETE WALK
<br />59 2521.511 2° BITUMINOUS WALK
<br />60 2531.501 6618 CURB AND GUTTER
<br />61 2531.507 6" CONCRETE DRIVEWAY PAVEMENT
<br />62 2531.602 CONCRETE PEDESTRIAN RAMP
<br />63 2540.602 INSTALL SALVAGED MAILBOX
<br />64 2540.602 INSTALL SALVAGED GUARD POST
<br />65 2540.602 INSTALL SALVAGED FLAG POLE
<br />66 2540.602 INSTALL SALVAGED SIGN
<br />67 2540.603 INSTALL SALVAGED RETAINING WALL
<br />68 2540.603 INSTALL SALVAGED FENCE
<br />69 2557.501 WIRE FENCE DESIGN 60 -9322
<br />70 2563.601 TRAFFIC CONTROL
<br />71 2564.536 FURNISH AND INSTALL SIGN
<br />72 2564.602 PAVEMENT MESSAGE (LEFT ARROW) - EPDXY
<br />73 2564.602 PAVEMENT MESSAGE (RIGHT ARROW) - EPDXY
<br />74 2564.602 PAVEMENT MESSAGE (THRU ARROW) - EPDXY
<br />75 2564.602 PAVEMENT MESSAGE (RIGHT - THRU ARROW) - EPDXY
<br />76 2564.602 PAVEMENT MESSAGE (RR CROSSING) - EPDXY
<br />77 2564.603 4° DOUBLE SOLID LINE YELLOW -EPDXY
<br />78 2564.603 4' SOLID LINE WHITE -EPDXY
<br />79 2564.603 4' SKIP LINE YELLOW -EPDXY
<br />80 2564.603 4" SOLID LINE YELLOW -EPDXY
<br />81 2564.603 24" STOP LINE WHITE - EPDXY
<br />82 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT
<br />83 2564.603 4" SOLID LINE WHITE -PAINT
<br />84 2564.603 4" SKIP LINE YELLOW -PAINT
<br />85 2564.603 4" SOLID LINE YELLOW -PAINT
<br />86 2564.603 24' STOP LINE WHITE - PAINT
<br />87 2565.602 LOOP DETECTOR
<br />88 2565.602 HANDHOLE
<br />89 2565.603 NON- METALLIC CONDUIT
<br />90 2573.502 SILT FENCE TYPE MACHINE SLICED
<br />91 2573.530 INLET PROTECTION
<br />SCHEDULE 5.0 - COUNTY ROAD 82 -- TOTAL
<br />EACH 6.00
<br />EACH 2.00
<br />TONS 55.00
<br />SF 24,300.00
<br />SF 2,400.00
<br />LF 8,100.00
<br />SY 210.00
<br />EACH 16.00
<br />EACH 3.00
<br />EACH 5.00
<br />EACH 2.00
<br />EACH 2.00
<br />LF 10.00
<br />LF 20.00
<br />IF 1,700.00 39.66
<br />L5 1.00 34,900.00
<br />ACH 51.00 3137.25
<br />ACH 52.00 355.00
<br />ACH 2.00 355.00
<br />ACH 2.00 355.00
<br />ACH 2.00 390.00
<br />ACH 2.00 3295.00
<br />LF 560.00 30.58
<br />LF 650.00 $0.38
<br />LF 1,460.00 30.29
<br />LF 7,160.00 30.29
<br />LF 116.00 $3.75
<br />LF 560.00 $0.48
<br />LF 650.00 30.23
<br />LF 1,460.00 $0.24
<br />LF 7,160.00 30.24
<br />LF 116.00 $2.78
<br />EACH 15.00 $775.00
<br />EACH 4.00 $650.00
<br />LF 300.00 $2.95
<br />LF 2,775.00 31.75
<br />EACH 50.00 3100.00
<br />3650.00
<br />$800.00
<br />$55.00
<br />32.81
<br />$1.70
<br />$7.90
<br />338.00
<br />$400.00
<br />370.00
<br />$250.00
<br />3300.00
<br />395.00
<br />575.00
<br />320.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />$0.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />$0.00
<br />30.00
<br />50.00
<br />30.00
<br />30.00
<br />$0.00
<br />30.00
<br />30.00
<br />$0.00
<br />30.00
<br />30.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />30.00
<br />$0.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />50.00
<br />50.00
<br />50.00
<br />6.00
<br />1.00
<br />33.56
<br />16,850.00
<br />3,630.00
<br />8,892.00
<br />237.20
<br />9.00
<br />3.00
<br />0.00
<br />2.00
<br />2.00
<br />17.00
<br />15.00
<br />1,365.00
<br />0.80
<br />53.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />513.00
<br />470.00
<br />1,440.00
<br />7,100.00
<br />86.00
<br />17.00
<br />3.00
<br />300.00
<br />100.00
<br />42.00
<br />$3,900.00
<br />$800.00
<br />$1,845.80
<br />$47,348.50
<br />$6,171.00
<br />$70,246.80
<br />$9,013.60
<br />$3,600.00
<br />3210.00
<br />30.00
<br />$600.00
<br />5190.00
<br />31,275.00
<br />3300.00
<br />$13,185.90
<br />33,920.00
<br />37,274.25
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />30.00
<br />30.00
<br />$246.24
<br />$108.10
<br />3345.60
<br />$1,704.00
<br />$239.08
<br />313,175.00
<br />31,950.00
<br />3885.00
<br />3175.00
<br />$4,200.00
<br />326,601.85 31,008,388.34
<br />SCHEDULE 6.0 - CHANGE ORDER N1
<br />1 SPEC TWO ADDITIONAL CATCHBASINS ON NOEL DRIVE LS 1.00 34,234.58 0.00 30.00 100 34,234.58
<br />2 SPEC ADDITION OF YARD INLET ON CARLA LANE LS 1.00 33,345.00 0.00 $0.00 1.00 33,345.00
<br />3 SPEC SCHOOL FENCE ADDITIONS LS 1.00 35,509.35 0.00 30.00 1.00 35,509.35
<br />4 SPEC WALL) PLANTER MODIFICATIONS AT GERVAIS MILL PARK LS 1.00 31,430.00 0.00 30.00 1.00 31,430.00
<br />5 SPEC CHANGE TO 44° X 27" ARCH OUTLET PIPE ON CTY. RD. B2 LS 1.00 318,057.64 0.00 $0.00 1.00 318,057.64
<br />SCHEDULE 6.0 - CHANGE ORDER N1 -- TOTAL
<br />01Prej1816600J /0071 /Partial Payments /Pay Estimate 146 (2005 Project) 4
<br />$0.00 532,576.57
<br />CONTRACT ITEMS
<br />THIS PERIOD
<br />TOTAL TO DATE
<br />REM
<br />SPEC.
<br />NO.
<br />REF.
<br />DESCRIPTION
<br />UNIT
<br />QTY.
<br />UNIT
<br />QTY. AMOUNT
<br />QTY. AMOUNT
<br />PRICE
<br />55 2506.522 INSTALL NEW FRAME AND RING CASTING
<br />56 2506.602 RECONSTRUCT DRAINAGE STRUCTURE
<br />57 2511.502 RANDOM RIP RAP CL IV
<br />58 2521.501 4" CONCRETE WALK
<br />59 2521.511 2° BITUMINOUS WALK
<br />60 2531.501 6618 CURB AND GUTTER
<br />61 2531.507 6" CONCRETE DRIVEWAY PAVEMENT
<br />62 2531.602 CONCRETE PEDESTRIAN RAMP
<br />63 2540.602 INSTALL SALVAGED MAILBOX
<br />64 2540.602 INSTALL SALVAGED GUARD POST
<br />65 2540.602 INSTALL SALVAGED FLAG POLE
<br />66 2540.602 INSTALL SALVAGED SIGN
<br />67 2540.603 INSTALL SALVAGED RETAINING WALL
<br />68 2540.603 INSTALL SALVAGED FENCE
<br />69 2557.501 WIRE FENCE DESIGN 60 -9322
<br />70 2563.601 TRAFFIC CONTROL
<br />71 2564.536 FURNISH AND INSTALL SIGN
<br />72 2564.602 PAVEMENT MESSAGE (LEFT ARROW) - EPDXY
<br />73 2564.602 PAVEMENT MESSAGE (RIGHT ARROW) - EPDXY
<br />74 2564.602 PAVEMENT MESSAGE (THRU ARROW) - EPDXY
<br />75 2564.602 PAVEMENT MESSAGE (RIGHT - THRU ARROW) - EPDXY
<br />76 2564.602 PAVEMENT MESSAGE (RR CROSSING) - EPDXY
<br />77 2564.603 4° DOUBLE SOLID LINE YELLOW -EPDXY
<br />78 2564.603 4' SOLID LINE WHITE -EPDXY
<br />79 2564.603 4' SKIP LINE YELLOW -EPDXY
<br />80 2564.603 4" SOLID LINE YELLOW -EPDXY
<br />81 2564.603 24" STOP LINE WHITE - EPDXY
<br />82 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT
<br />83 2564.603 4" SOLID LINE WHITE -PAINT
<br />84 2564.603 4" SKIP LINE YELLOW -PAINT
<br />85 2564.603 4" SOLID LINE YELLOW -PAINT
<br />86 2564.603 24' STOP LINE WHITE - PAINT
<br />87 2565.602 LOOP DETECTOR
<br />88 2565.602 HANDHOLE
<br />89 2565.603 NON- METALLIC CONDUIT
<br />90 2573.502 SILT FENCE TYPE MACHINE SLICED
<br />91 2573.530 INLET PROTECTION
<br />SCHEDULE 5.0 - COUNTY ROAD 82 -- TOTAL
<br />EACH 6.00
<br />EACH 2.00
<br />TONS 55.00
<br />SF 24,300.00
<br />SF 2,400.00
<br />LF 8,100.00
<br />SY 210.00
<br />EACH 16.00
<br />EACH 3.00
<br />EACH 5.00
<br />EACH 2.00
<br />EACH 2.00
<br />LF 10.00
<br />LF 20.00
<br />IF 1,700.00 39.66
<br />L5 1.00 34,900.00
<br />ACH 51.00 3137.25
<br />ACH 52.00 355.00
<br />ACH 2.00 355.00
<br />ACH 2.00 355.00
<br />ACH 2.00 390.00
<br />ACH 2.00 3295.00
<br />LF 560.00 30.58
<br />LF 650.00 $0.38
<br />LF 1,460.00 30.29
<br />LF 7,160.00 30.29
<br />LF 116.00 $3.75
<br />LF 560.00 $0.48
<br />LF 650.00 30.23
<br />LF 1,460.00 $0.24
<br />LF 7,160.00 30.24
<br />LF 116.00 $2.78
<br />EACH 15.00 $775.00
<br />EACH 4.00 $650.00
<br />LF 300.00 $2.95
<br />LF 2,775.00 31.75
<br />EACH 50.00 3100.00
<br />3650.00
<br />$800.00
<br />$55.00
<br />32.81
<br />$1.70
<br />$7.90
<br />338.00
<br />$400.00
<br />370.00
<br />$250.00
<br />3300.00
<br />395.00
<br />575.00
<br />320.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />$0.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />$0.00
<br />30.00
<br />50.00
<br />30.00
<br />30.00
<br />$0.00
<br />30.00
<br />30.00
<br />$0.00
<br />30.00
<br />30.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />30.00
<br />$0.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />50.00
<br />50.00
<br />50.00
<br />6.00
<br />1.00
<br />33.56
<br />16,850.00
<br />3,630.00
<br />8,892.00
<br />237.20
<br />9.00
<br />3.00
<br />0.00
<br />2.00
<br />2.00
<br />17.00
<br />15.00
<br />1,365.00
<br />0.80
<br />53.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />513.00
<br />470.00
<br />1,440.00
<br />7,100.00
<br />86.00
<br />17.00
<br />3.00
<br />300.00
<br />100.00
<br />42.00
<br />$3,900.00
<br />$800.00
<br />$1,845.80
<br />$47,348.50
<br />$6,171.00
<br />$70,246.80
<br />$9,013.60
<br />$3,600.00
<br />3210.00
<br />30.00
<br />$600.00
<br />5190.00
<br />31,275.00
<br />3300.00
<br />$13,185.90
<br />33,920.00
<br />37,274.25
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />30.00
<br />$0.00
<br />$0.00
<br />$0.00
<br />30.00
<br />30.00
<br />$246.24
<br />$108.10
<br />3345.60
<br />$1,704.00
<br />$239.08
<br />313,175.00
<br />31,950.00
<br />3885.00
<br />3175.00
<br />$4,200.00
<br />326,601.85 31,008,388.34
<br />SCHEDULE 6.0 - CHANGE ORDER N1
<br />1 SPEC TWO ADDITIONAL CATCHBASINS ON NOEL DRIVE LS 1.00 34,234.58 0.00 30.00 100 34,234.58
<br />2 SPEC ADDITION OF YARD INLET ON CARLA LANE LS 1.00 33,345.00 0.00 $0.00 1.00 33,345.00
<br />3 SPEC SCHOOL FENCE ADDITIONS LS 1.00 35,509.35 0.00 30.00 1.00 35,509.35
<br />4 SPEC WALL) PLANTER MODIFICATIONS AT GERVAIS MILL PARK LS 1.00 31,430.00 0.00 30.00 1.00 31,430.00
<br />5 SPEC CHANGE TO 44° X 27" ARCH OUTLET PIPE ON CTY. RD. B2 LS 1.00 318,057.64 0.00 $0.00 1.00 318,057.64
<br />SCHEDULE 6.0 - CHANGE ORDER N1 -- TOTAL
<br />01Prej1816600J /0071 /Partial Payments /Pay Estimate 146 (2005 Project) 4
<br />$0.00 532,576.57
<br />
|