Laserfiche WebLink
Snow Blower for John Deere <br />Tractor PW 69 2 0 0 0 0 30,000 0 0 0 0 0 30,000 <br /> Capital Fund 400 - General 30,000 30,000 <br />Front snow blower for John Deere tractor including three-point front hitch. <br /> Snowblower Attachement for <br />Toolcat PW 70 2 0 0 0 8,500 0 9,000 0 0 0 0 17,500 <br /> Capital Fund 400 - General 8,500 9,000 17,500 <br />snow blower attachement for Toolcat for cleaning sidewalks <br /> County Road C PW 71 2 390,000 0 0 0 0 0 0 0 0 0 390,000 <br /> Capital Fund 450 - Infrastructure 390,000 390,000 <br />City share of planning and design for 2026 4-3 conversion. Sidewalk was added in summer 2024, which will increase City's portion of costs. <br /> Rice Street PW 72 2 0 125,000 100,000 300,000 0 0 0 0 0 0 525,000 <br /> Capital Fund 450 - Infrastructure 125,000 100,000 300,000 525,000 <br /> Labore Road - Edgerton to D PW 73 2 0 0 3,300,000 0 0 0 0 0 0 0 3,300,000 <br /> Capital Fund 450 - Infrastructure 3,300,000 3,300,000 <br />Reconstruction of Labore Road from Edgerton to County Road D <br /> Traffic Counts PW 74 2 0 6,500 0 0 0 6,500 0 0 6,500 8,000 27,500 <br /> Capital Fund 450 - Infrastructure 6,500 6,500 6,500 8,000 27,500 <br />Conduct traffic counts on State Aid streets as required. <br /> John Deere Tractor with Flail <br />Mower PW 75 2 0 0 0 0 0 0 95,000 0 0 0 95,000 <br /> Capital Fund 400 - General 95,000 95,000 <br />Tractor used to mow boulevards in the summer and blow sidewalks in the winter along with other projects. <br /> EV Charging Station PW 77 2 0 0 50,000 0 0 0 0 0 0 0 50,000 <br /> Capital Fund 400 - General 50,000 50,000 <br />Install EV charging station at City Hall <br /> Dynamic Speed Limit Sign PW 78 3 10,000 0 0 0 0 0 0 0 0 0 10,000 <br /> Capital Fund 400 - General 10,000 10,000 <br />Dynamic speed limit sign for County Road B2 at bottom of hill. <br /> 35E LC Road Signal Replacement PW 82 2 70,000 0 0 0 0 0 0 0 0 0 70,000 <br /> Capital Fund 450 - Infrastructure 70,000 70,000 <br />MNDot signal replacement at 35E and LC Road. City will have to pay a portion of the cost based on cost sharing policy of MNDot. <br /> Roadbotics Street Survey PW 83 2 10,000 0 0 0 0 0 12,000 0 0 0 22,000 <br /> Capital Fund 450 - Infrastructure 10,000 12,000 22,000 <br />Survey of LC streets to determine new ratings following initial survey in 2020. <br /> Bobcat Grapple PW 84 3 0 0 0 0 0 0 0 0 7,000 0 7,000 <br /> Capital Fund 400 - General 7,000 7,000 <br />Replace grapple attachement for Bobcat skid-steer and Toolcat <br /> Department Project # Priority 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total <br />Produced Using Plan-It CIP Software Page 17 / 2652