|
Plow for Toolcat Public Works PW 04 2 5,500
<br />RR Crossing Little Canada Road Public Works PW 05 2 90,000
<br />Bldg. Equip/Maint.Buildings PW 06 2 20,000
<br />Speed Board Public Works PW 16 3 5,000
<br />Small Equipment Public Works PW 17 3 5,750
<br />Asphalt Roller Trailer Public Works PW 26 5 13,000
<br />Pressure Washer Public Works PW 27 4 2,000
<br />PW Truck - 116 Public Works PW 28 2 115,000
<br />Street Sweeper Public Works PW 30 2 275,000
<br />Wood Chip Box Public Works PW 31 4 6,000
<br />Dump Truck Chassis and Equipment Public Works PW 35 1 170,000
<br />Country Drive - LC Rd to So Owasso Public Works PW 40 2 1,190,000
<br />LC Road 4-3 and Roundabout Public Works PW 67 2 8,703,750
<br />County Road C Public Works PW 71 2 390,000
<br />Dynamic Speed Limit Sign Public Works PW 78 3 10,000
<br />35E LC Road Signal Replacement Public Works PW 82 2 70,000
<br />Roadbotics Street Survey Public Works PW 83 2 10,000
<br />New Ped Bridge Over 35E Public Works PW 88 2 400,000
<br />Truck 122 Repurpose Public Works PW 91 3 6,000
<br />Loader Bucket for John Deere Public Works PW 93 3 17,000
<br />Bobcat Snow Pusher Public Works PW 97 3 15,000
<br />Blower Public Works PW 99 2 9,500
<br />Snow Pusher Public Works PW 105 3 4,000
<br />Tire Machine Public Works PW 106 3 4,000
<br />Lift Station Upgrades Sewer Sewer 05 2 11,500
<br />Lining Sanitary (slip lining)Sewer Sewer 06 2 300,000
<br />County Road B Lift Station Pumps Sewer Sewer 16 2 25,000
<br />Manhole Repairs Sewer Sewer 18 2 100,000
<br />County Road B Lift Station/Forcemain Upgrades Sewer Sewer 22 1 650,000
<br />Easement Machine Tracks Sewer Sewer 24 3 5,000
<br />Keller Lift Station Controls Upgrade Sewer Sewer 26 2 30,000
<br />Pond Cleanout Storm Water Storm 04 1 40,000
<br />Catch Basin Repair Storm Water Storm 05 1 11,000
<br />Rain Garden Maintenance Storm Water Storm 09 3 21,000
<br />Country Drive - LC Rd to So Owasso - PW40 Storm Water Storm 13 2 52,500
<br />Jessica Court Storm Outlet Repair Storm Water Storm 43 2 50,000
<br />Large Water Meter Replacement Water Water 03 2 32,782
<br />Line Repairs Water Water 04 1 51,500
<br />Tower Inspection Water Water 06 2 50,000
<br />Gate Valve Operator Water Water 07 3 8,500
<br />Hydrant Diffusers Water Water 08 3 3,000
<br />Water Meter System Gateway Water Water 09 2 14,000
<br />iPad Pro Water Water 14 2 6,500
<br />15 kW portable generator Water Water 17 2 15,000
<br />Booster Station Pump 2 Water Water 18 1 25,000
<br />Total for 2026 14,877,905
<br />GRAND TOTAL 14,877,905
<br />Project Name Department Project # Priority Project Cost
<br />Produced Using Plan-It CIP Software Page 2 / 2
<br />108
|