Laserfiche WebLink
City of Little Canada <br /> Fee Schedule Page 6 of 22 <br />General Construction <br /> <br />BUILDING PERMIT FEES <br />Value Range Fee <br />$1 - $500 $29.50 <br />$501 - $2,000 $28.00 for the first $500 plus $3.70 for each additional $100, or <br />fraction thereof, to and including $2,000 <br />$2,001 - $25,000 $83.50 for the first $2,000 plus $16.55 for each additional $1,000, <br />or fraction thereof, to and including $25,000 <br />$25,001 - $50,000 $464.15 for the first $25,000 plus $12.00 for each additional <br />$1,000, or fraction thereof, to and including $50,000 <br />$50,001 - $100,000 $764.15 for the first $50,000 plus $8.45 $8.85 for each additional <br />$1,000, or fraction thereof, to and including $100,000 <br />$100,001 - $500,000 $1,186.65 $1,206.65 for the first $100,000 plus $6.75 $7.05 for <br />each additional $1,000, or fraction thereof, to and including <br />$500,000 <br />$500,001 - $1,000,000 $3,886.65 $4,026.55 for the first $500,000 plus $5.50 $5.75 for <br />each additional $1,000, or fraction thereof, to and including <br />$1,000,000 <br />$1,000,001 and up $6,636.65 $6,901.55 for the first $1,000,000 plus $4.50 $4.70 for <br />each additional $1,000 <br />Misc Residential Fee <br />Solar Panel Installation-residential $200.00 (flat fee) <br />Plan Check Fee <br />Plan Check Fee Up to 65% of the calculated permit fee <br />Plan Check for Similar/Identical <br />Buildings (determination made by <br />the Building Official) <br />Up to 25% of the calculated permit fee <br />Miscellaneous/Other Fee <br />Demolition (Must Contact MN <br />Pollution Control and Ramsey <br />County Environmental Health ten <br />(10) days prior to actual <br />demolition. <br />Fee based on valuation. <br />Fee Refunds Upon written application not more than 80% of building permit <br />fee and 80% of plan review fee when plans are withdrawn or <br />cancelled before review is done <br />Inspection Outside Normal <br />Business Hours <br />$75 per hour (minimum of two hours) <br />Reinspections $75 per each required reinspection <br />Sod Escrow (if turf is not <br />established at time of occupancy) <br />$2,000.00 <br />Work Commencing Before Permit <br />Issuance <br />100% of Normal Building Permit Fee