Laserfiche WebLink
18 2105.501 COMMON POND EXCAVATION <br />19 2131.502 CALCIUM CHLORIDE SOLUTION <br />20 2211,501 AGGREGATE BASE CLASS <br />21 2211,501 AGGREGATE BASE CLASS 5 (DRIVEWAY) <br />22 2232.501 MILL BITUMINOUS PAVEMENT <br />23 2350.501 TYPE MV4 WEAR COURSE MIXTURE (DRIVEWAY) <br />24 2350,501 TYPE MV4 WEAR COURSE MIXTURE <br />25 2350.502 TYPE LV3 NON - WEARING COURSE MIXTURE <br />26 2357.502 BITUMINOUS MATERIAL FOR TACK COAT <br />27 2501,515 12" RC PIPE APRON <br />28 2501.515 18" RC PIPE APRON <br />29 2503.541 12" RC PIPE SEWER DES 3006, CLV <br />30 2503.541 15" RC PIPE SEWER DES 3006, CLV <br />31 2503.541 18" RC PIPE SEWER DES 3006, CLIII <br />32 2503.602 15"X4" SERVICE WYE <br />33 2503.603 4" PVC SANITARY SERVICE <br />34 2503.603 8" PVC PIPE SEWER <br />35 2503.603 15" PVC PIPE SEWER <br />36 2503.603 24" STEEL CASING PIPE (JACKED) <br />37 2503.603 3" OUTSIDE DROP <br />38 2504.602 HYDRANT & VALVE <br />39 2504.602 1" WATER SERVICE CONNECTION <br />40 2504.602 CONNECT TO EXISTING WATERMAIN <br />41 2504.602 8" GATE VALVE <br />42 2504.603 8" WATER MAIN - DUCT IRON CL 52 <br />43 2504.603 1 " COPPER WATER SERVICE PIPE <br />44 2504.620 DUCTILE IRON FITTINGS <br />45 2506.502 CONST DRAINAGE STRUCTURE SPEC <br />46 2506.502 CONST DRAINAGE STRUCTURE DES SPEC 24 "X36" <br />47 2506.502 CONST DRAINAGE STRUCTURE DESIGN 484020 <br />48 2506.602 CONSTRUCT SANITARY MANHOLE <br />49 2511.502 RANDOM RIPRAP CLASS IV <br />50 2531.501 CONCRETE CURB & GUTTER (SURMOUNTABLE) <br />51 2531.507 6" CONCRETE DRIVEWAY PAVEMENT <br />52 2540.602 INSTALL MAILBOX <br />53 2557.603 INSTALL FENCE <br />54 2563.601 TRAFFIC CONTROL <br />55 2564.536 INSTALL SIGN <br />56 2573.502 SILT FENCE, TYPE HEAVY DUTY <br />57 2575.605 EROSION CONTROL BLANKET <br />58 SPEC GRADATION TEST, CLASS 5 <br />59 SPEC PROCTOR TEST, CLASS 5 <br />60 SPEC PROCTOR TEST <br />61 SPEC DENSITY TEST, INPLACE <br />62 SPEC CONCRETE TESTING <br />63 SPEC BITUMINOUS CORE DENSITY <br />I2. ..0 8T .w...ONFFAGT ITEF98w..P,111111 .,,.. <br />UM1BT QTY UNIT. OTY, <br />SCHEDULE 2.0• SEXTANT STREET- CONSTRUCTION TOTAL <br />OTAL TO PATE V { <br />AMOUNT 1 <br />CY 491 39.00 0.00 <br />GAL 1200 30.85 0.00 <br />TON 1570 311.00 0.00 <br />TON 57 314.00 0.00 <br />SY 39 35.00 0.00 <br />TON 8 5100.00 0.00 <br />TON 284 $40.00 0.00 <br />TON 368 337.25 0.00 <br />GAL 148 31.20 0.00 <br />EA 2 3740.00 0.00 <br />EA 1 3860.00 0.00 <br />LF 166 327.00 0.00 <br />LF 72 329.00 0.00 <br />LF 105 332.00 0.00 <br />EA 5 3350.00 0.00 <br />LF 200 332.00 0.00 <br />LF 125 340.00 0.00 <br />LF 921 360.00 0.00 <br />LF 100 3140.63 0.00 <br />LF 10.25 3200.00 0.00 <br />EA 2 53,300.00 0.00 <br />EA 4 5420.00 0.00 <br />EA 2 31,300.00 0.00 <br />EA 1 31,000.00 0.00 <br />LF 815 325.00 0.00 <br />LF 80 322.00 0.00 <br />LEIS 450 37.00 0.00 <br />EA 1 33,400.00 0.00 <br />EA 3 31,400.00 0.00 <br />EA 4 31,600.00 0,00 <br />EA 3 93100.00 0.00 <br />TON 29 360.00 0.00 <br />LF 1790 37.50 0.00 <br />SY 109 $30.00 155.00 <br />EA 4 355.00 0.00 <br />LF 285 93.76 0,00 <br />LS 1 9700.00 0.00 <br />EA 6 335.00 0.00 <br />LF 950 92.40 0.00 <br />SY 110 34.00 0.00 <br />EA 1 570.00 0.00 <br />EA 1 390.00 0.00 <br />EA 2 390.00 0.00 <br />EA 50 350.00 0.00 <br />EA 6 3140.00 0.00 <br />EA 18 317.30 0.00 <br />90.00 491.00 <br />30.00 1200.00 <br />30.00 1570.00 <br />30.00 57.00 <br />30.00 22.00 <br />30.00 4.00 <br />30.00 283.30 <br />30.00 369.00 <br />30.00 200.00 <br />30.00 2.00 <br />50.00 1.00 <br />30.00 144.00 <br />$0.00 24.00 <br />90.00 98.00 <br />30.00 5.00 <br />50.00 200.00 <br />30.00 125.00 <br />30.00 921.00 <br />30.00 100.00 <br />$0.00 0.00 <br />50.00 2.00 <br />30.00 5.00 <br />30.00 2.00 <br />$0.00 2.00 <br />30.00 799.00 <br />30.00 122.00 <br />30.00 464.00 <br />30.00 1.00 <br />30.00 2.00 <br />30.00 5.00 <br />30.00 3.00 <br />30.00 18.00 <br />S0.00 1946.00 <br />34,650.00 253.00 <br />30.00 4.00 <br />90.00 407.00 <br />30.00 1.00 <br />30.00 7.00 <br />30.00 1835.00 <br />30.00 0.00 <br />50.00 1.00 <br />30.00 1.00 <br />30.00 1.00 <br />30.00 26.00 <br />30.00 1.00 <br />50.00 2.00 <br />34,419.00 <br />31,020.00 <br />317,270.00 <br />3798.00 <br />S110.00 <br />3400.00 <br />311,332.00 <br />913,745.25 <br />3240.00 <br />31,480.00 <br />3860.00 <br />33,888.00 <br />5696.00 <br />33,136.00 <br />31,750.00 <br />36,400 00 <br />35,000.00 <br />355,260.00 <br />314,063.00 <br />30.00 <br />36,600.00 <br />32,100 00 <br />32,600.00 <br />32,000.00 <br />519.975.00 <br />32,684.00 <br />33,248 00 <br />33,400.00 <br />32,800 00 <br />38,000.00 <br />311,10000 <br />31,080 00 <br />314,595.00 <br />37,590.00 <br />3220.00 <br />31,530.32 <br />3700.00 <br />3245.00 <br />84,404.00 <br />SOOo <br />570.00 <br />390.00 <br />390.00 <br />31,300.00 <br />3140.00 <br />334.60 <br />36,690.00 3286,347.27 <br />SCHEDULE 3.0 STARK STREET <br />1 2021.501 MOBILIZATION LS 1 312,000.00 0.00 30.00 1.00 <br />2 2101.502 CLEARING TREE 18 322.23 0.00 30.00 118.00 <br />3 2101.507 GRUBBING 1'REE 18 522.23 0.00 30.00 118.00 <br />4 2104.501 REMOVE CONCRETE CURB & GUTTER LF 175 30.90 000 3x000 216,00 <br />5 2104.501 REMOVE SANITARY SEWER PIPE LF 281 38.00 0.00 50.00 393.00 <br />6 , „"219a5(45is.(m)(3AK9V BITOo(NOUS DRIVEWAY PAVEMENT SY3 450 32.10 0.00 50.00 478.00 <br />312000.00 <br />32,623 14 <br />32,523 14 <br />5194 40 <br />33.144 00 <br />31.003,80 <br />