My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-23-2005 Council Agenda
>
City Council Packets
>
2000-2009
>
2005
>
03-23-2005 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2012 10:29:35 AM
Creation date
4/13/2012 10:24:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ye" ett ceanaca, <br />515 Little Canada Road, Little Canada. MN 55117 -1600 <br />(651) 766 -4029 / FAX: (651) 766 -4048 <br />www.ci.little-canada.mn.us <br />MEMORANDUM <br />TO: Mayor Blesener and Members of the City Council <br />FROM: Joel Hanson, City Administrator <br />DATE: March 18, 2005 <br />RE: 2005 Street Sweeping <br />MAYOR <br />,Bill Blesener <br />COUNCIL <br />Jim LaValle <br />Rick Montour <br />Barbara Allan <br />John Keis <br />ADMINISTRATOR <br />Joel R.I - fanson <br />Quotations were solicited from two vendors for our 2005 street sweeping. (The specification <br />form is attached for your review.) You will note that I have requested sweeping to begin on <br />March 281h1, weather permitting. This is much earlier than previous years. Staff feels it is <br />appropriate to try an earlier sweep to minimize sediments flowing into our storm sewer <br />system. Should we experience inclement weather that requires sanding, we will not use any <br />sand, and go with a "salt -only" application at a lighter rate. Again, this would only occur if <br />absolutely necessary. <br />The two companies solicited were George's Companies and Allied Blacktop Company. Both <br />of them have swept for the City before and can do a quality job. Their quotes for the service <br />are attached to this memo, You will note that Allied has provided the lowest price except for <br />Alternate 1 for Program 2. This alternate would have the contractor sweep areas and then <br />dump the materials at designated sites within the City. We would then come in at a later time <br />and pick up the material to haul it to the County's disposal site. That may be a viable option <br />for our summer sweep and staff will further evaluate that possibility at the conclusion of the <br />spring sweeping. <br />With the volume of materials generated by the spring sweeping, we feel the most efficient <br />method is Program 1 at an hourly cost of $195 per hour. This will include two sweepers and <br />one tandem dump truck to haul from both sweepers. We estimate the total cost of this <br />program to be in the range of 87,800 (80 hours of sweeping) to $9,750 (100 hours of <br />sweeping). <br />cc: Pete Capistrant. Allied Blacktop Company <br />George Hanna. George's Companies. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.