Laserfiche WebLink
May 06 05 06:43a <br />3RC <br />TIME & MATERIAL. <br />DATE OF WORK: <br />2004.39 <br />DESCRIPTION OF WORK: <br />THREE RT ERS <br />CONSTRUCTION <br />11/23/2004 <br />LITTLE CANADA GERVAIS HILLS <br />REPAIR WORK FOR C(1Y EXTENDED EXISTING STORM SEW <br />AND PLACED RfP•RAP ON NORTH SIDE OF CTY B2 <br />cw, .+uwu <br />EQUIPMENT <br />FIRS <br />RATE <br />PREMIUM <br />RATE <br />TOTAL. <br />LABOR <br />400 KOMATSU <br />5 <br />A <br />$130.00 <br />a <br />$ 650.00 <br />450 KOMATSU LOADER <br />5 <br />a <br />$100.00 <br />= <br />= <br />$ 500.00 <br />INGERSOL RAND <br />0 <br />•. <br />590.00 <br />= <br />= <br />$ - <br />SMALL COMPACTOR <br />a <br />$80.00 <br />$ - <br />= <br />$ - <br />6 <br />$ 58.00 <br />= <br />$ 280.00 <br />_ <br />a <br />TOTAL, EQUIPMENT <br />$ 84.00 <br />= <br />- <br />$ - <br />OPERATOF <br />OPERATOR LOADER <br />5 <br />0 <br />LABOR <br />HAS <br />REGULAR <br />RATE <br />PREMIUM <br />RATE <br />TOTAL. <br />LABOR <br />SUPERINTENDENT W/1`RUCK <br />2 <br />@ <br />$ 80.00 <br />= <br />$ 180.00 <br />BRYAN ROCK CL 3 RIP -RAP <br />1 <br />$ 120.00 <br />= <br />$ <br />FOREMAN WrtRUCK <br />5 <br />0 <br />; 70.00 <br />$413.22 <br />= <br />$ 350.00 <br />$ 413.22 <br />0 <br />$ 105.00 <br />= <br />$ - <br />OPERATOR BACKHOE <br />5 <br />6 <br />$ 58.00 <br />= <br />$ 280.00 <br />a <br />$ 84.00 <br />= <br />- <br />$ - <br />OPERATOF <br />OPERATOR LOADER <br />5 <br />0 <br />$ 54.00 <br />= <br />5 270.00 <br />Sr <br />$ 81.00 <br />=$ <br />- <br />OPERATOR BOBCAT <br />@ <br />= <br />5 - <br />@ <br />$ - <br />° <br />5 - <br />OPERATOR COMPACTOR <br />@ <br />$ 50.00 <br />= <br />$ - <br />®I <br />$ 75.00 <br />= <br />3 - <br />PIPE LAYER <br />5 <br />a <br />$ 50.00 <br />= <br />$ 250.00 <br />6 <br />$ 50.00 <br />=$ <br />BOTTOM MAN <br />5 <br />(a <br />$ 50.00 <br />= <br />3 250.00 <br />a <br />$ 75.00 <br />= <br />$ - <br />TOP MAN <br />5 <br />412 <br />$ 48.00 <br />= <br />$ 240.00 <br />JD <br />s 72.00 <br />= <br />S - <br />TOTAL LABOR <br />MATERIALS <br />TAX-IN <br />HANSON CONCRETE <br />1 <br />QD, <br />$401.77 <br />= <br />$ 401.77 <br />BRYAN ROCK CL 3 RIP -RAP <br />1 <br />$322.40 <br />= <br />$ 322,40 <br />MINNESOTA PIPE <br />1 <br />.t <br />® <br />$413.22 <br />= <br />$ 413.22 <br />a <br />TOTAL MATERIALS <br />TOTAL EQUIPMENT, LABOR, & MATERIALS <br />MARK -UP <br />GRAND TOTAL EXTRA FOR THIS EXTRA WORK <br />$ 1,150.00 <br />$ 1,500.00 <br />$ 1,137.39 <br />5 4,087.39 <br />15% $ 813,11 <br />S 4 <br />p.2 <br />