ITEM SPEC. CONTRACT ITEMS <br />NO:. REF. DESCRIPTION UNIT QTY. UNIT <br />PRICE <br />THIS PERIOD <br />QTY. AMOUNT. <br />TOTAL TO DATE <br />OTT. AMOUNT <br />45 SPEC DENSITY TEST, INPLACE <br />46 SPEC GRADATION TEST, CLASS 5 <br />47 SPEC PROCTOR TEST, CLASS <br />48 SPEC DENSITY TEST, CLASS 5 <br />49 SPEC CALCIUM CHLORIDE <br />50 SPEC DENSITY TEST BITUMINOUS <br />51 SPEC CONCRETE TESTING <br />EACH 563.00 0.00 $0.00 0.00 50.00 <br />EACH 5107.10 0.00 $0.00 0.00 $0.00 <br />EACH 8137.50 0.00 80.00 0.00 80.00 <br />EACH 563.00 0.00 50.00 4.00 5252.00 <br />GAL 4,00 81.00 0.00 50.00 0.00 $0.00 <br />EACH 542.00 0.00 50.00 0.00 50.00 <br />EACH $231.00 0.00 $0.00 4.00 $924.00 <br />T SCHEDULE 4.0- TWIN LAKE ROAD/TRAIL - TOTAL 80.00 5457,582.12 <br />SCHEDULE 5.0 - TWIN LAKE ROAD/TRAIL WATERMAIN <br />1 2503.620 FITTINGS LF 1,800 84,65 0.00 50.00 2115.00 69,834.75 <br />2 2504.602 YARD HYDRANT (FROST PROOF) EACH 1 52,320.00 0.00 80.00 1.00 $2,320.00 <br />3 2504.602 HYDRANT AND VALVE EACH 9 $2,815.00 0.00 $0.00 10.00 $28,150.00 <br />4 2504.602 CONNECT TO EXISTING WATERMAIN EACH 1 $750.00 0.00 $0.00 2.00 51,500.00 <br />5 2504.602 1.5' CORPORATION STOP EACH 50 5188.00 0.00 80.00 47.00 $8,836.00 <br />6 2504.802 1,5' CURB STOP AND BOX EACH 50 5315.00 0.00 50.00 47.00 814,805.00 <br />7 2504.603 1.5" TYPE K COPPER PIPE LF 1,500 816.00 0.00 $0.00 1090.00 517,440.00 <br />8 2504.603 4' WATERMAIN -DUCT IRON CL 52 LF 320 819.00 291.00 $5,529.00 304.00 $5,776.00 <br />9 2504.603 6' WATERMAIN -DUCT IRON CL 52 LF 125 820.00 0,00 80.00 10800 52,160.00 <br />10 2504.603 8' WATERMAIN -DUCT IRON CL 52 LF 4,225 $20.65 0,00 $0.00 466200 896,270.30 <br />11 2504.607 8' GATE VALVE EACH 4 81,230.00 0.00 $0.00 3.00 $3,690.00 <br />12 2504.607 4' GATE VALVE EACH 1 51,000.00 0.00 $0.00 1.00 51,000.00 <br />13 SPEC 14' STEEL CASING PIPE (JACKED) LF 290 8200.00 0.00 50.00 264,00 552,800.00 <br />14 SPEC 12 "X8 "WET TAP WNALVE EACH 1 $2,200.00 0.00 80.00 1,00 $2,200.00 <br />15 SPEC DENSITY TEST EACH 20 563.00 0,00 50.00 30.00 51,890.00 <br />T SCHEDULE 5,0- TWIN LAKE ROAD/TRAIL WATERMAIN -TOTAL, $5,529.00 $248,672.05 <br />SCHEDULE 6.0 - TWIN LAKE BOULEVARD <br />1 2021.501 MOBILIZATION LS 1 $11,106.00 0,00 50.00 1.00 $11,106.00 <br />2 2101.501 CLEARING ACRE 0,1 54,725.00 0.00 $0.00 0.00 $0.00 <br />3 2101.501 GRUBBING ACRE 0,1 $2,100,00 0.00 $0.00 0.00 $0.00 <br />4 2104,501 REMOVE CONCRETE CURB AND GUTTER LF 110 $2.20 0.00 5050 108.00 $23760 <br />5 2104,505 REMOVE BITUMINOUS PAVEMENT SY 1,350 $2.25 0.00 $0.00 1872.00 $4,212,00 <br />6 2104,513 SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) LF 750 $3.00 0.00 $0.00 1668.00 $5,004.00 <br />7 2104.523 SALVAGE FENCE LF 40 810.00 0.00 50.00 17.00 5170.00 <br />8 2104.523 SALVAGE SIGN EACH 1 521.00 0.00 $0.00 0.00 $0.00 <br />9 2104.523 SALVAGE MAILBOX EACH 16 $26.25 0.00 $0.00 10.00 $262,50 <br />10 2211.501 AGGREGATE BASE CLASS 5 TON 575 $7.50 0.00 $0.00 813.00 56.097,50 <br />11 2231,602 BITUMINOUS PATCH SY 220 $21.00 0.00 80.00 102.60 $2,154.60 <br />12 2232.501 MILL BITUMINOUS SURFACE (1.5') SY 160 $8.40 0.00 80.00 0,00 50.00 <br />13 2350,501 TYPE MV4 WEAR COURSE MIXTURE TON 150 851.50 0.00 80.00 190.31 59,800.97 <br />14 2350.501 TYPE LV38ASE COURSE MIXTURE TON 185 845.85 0.00 80.00 256.89 811,778.41 <br />15 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL 75 81.05 0.00 80.00 75.00 $78.75 <br />16 2401.501 REMOVE SANITARYSEWER PIPE LF 18 810.00 0.00 50.00 0.00 80.00 <br />17 2503,602 8' SDR 35 PVC SANITARY SEWER LF 18 545.00 0.00 30.00 0.00 $0,00 <br />18 2503,541 CONNECT TO EXISTING SANITARY SEWER EACH 1 $2,500.00 0,00 $0.00 0,00 50.00 <br />19 2503.541 CONNECT TO EXISTING SANITARY MANHOLE EACH 1 52,500.00 0.00 $0,00 0.00 50.00 <br />20 2503.620 FITTINGS LB 125 $5.75 0.00 8000 340.00 81,955.00 <br />21 2504.602 CONNECT TO EXISTING WATERMAIN EACH 2 5800.00 0,00 $0.00 1.00 $800.00 <br />22 2504.602 1.5' CORPORATION STOP EACH 16 5188.00 0,00 50.00 18.00 $3,384.00 <br />23 2504.602 1.5' CURB STOP AND BOX EACH 16 8315.00 0,00 $0.00 18.00 $5,670,00 <br />24 2504.603 1.5' TYPE K COPPER PIPE LF 480 51500 0.00 50.00 551.00 $8,816,00 <br />25 2504.603 8' WATERMAIN-DUCT IRON CL 52 LF 650 522.35 0.00 $0.00 628.00 $14,035,80 <br />26 2504.607 8' GATE VALVE EACH 5 51,230.00 0.00 50.00 2.00 52,460.00 <br />27 2506.511 MANHOLE REPAIR EACH 1 $800.00 0.00 80,00 0.00 50.00 <br />28 2531.501 CONCRETE CURB AND GUTTER, B618 LF 110 $17.80 0.00 $500 108.00 $1,922,40 <br />29 2540.602 REINSTALL MAILBOX EACH 16 652.50 0.00 60.00 10.00 $525.00 <br />30 2557.603 INSTALL SALVAGED FENCE LF 40 $10.00 0.00 $0.00 17.00 $170.00 <br />31 2564.536 INSTALL SIGN EACH 1 $89.25 0.00 60.00 0.00 60.00 <br />32 2564.603 4' DOUBLE SOLID LINE YELLOW -EPDXY LF 700 5200 0.00 50.00 0.00 $0.00 <br />33 2564.603 4" SOLID LINE WHITE -EPDXY LF 700 $1.50 0.00 $0.00 0.00 50.00 <br />34 SPEC DIRECTIONAL BORE 8° HDPE (DIPS) LF 1,970 531,00 0.00 50.00 2107.00 665,317.00 <br />35 SPEC 14' STEEL CASING PIPE (JACKED) LF 360 $200.00 0.00 $0.00 381.00 676,200.00 <br />36 SPEC 12" X 8' WET TAP WNALVE EACH 1 52,400.00 0.00 $0.00 1.00 52,400.00 <br />37 SPEC BITUMINOUS CURB LF 750 54.20 0.00 60.00 431.00 51,810.20 <br />T SCHEDULE 6.0- TWIN LAKE BOULEVARD - TOTAL $000 5236,36772 <br />0 /Proy016600.1 /0071 /Partial Payments /Pay Estimate 17 (2004 Project) <br />