My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-2005 Council Agenda
>
City Council Packets
>
2000-2009
>
2005
>
08-10-2005 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2012 11:37:46 AM
Creation date
4/24/2012 11:31:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cejV 97 %ceasek <br />MAYOR <br />13111 Blesener <br />COUNCIL <br />Jim LaValle <br />Rick Montour <br />Barbara Allan <br />John Keis <br />515 Little Canada Road, Little Canada, MN 55117 -1600 ADMINISTRATOR <br />(651) 766 -4029 / FAX: (651) 766 -4048 Joel R. Hanson <br />www.ci.liffle-canada.mn.us <br />MEMORANDUM <br />TO: Mayor Blesener & Members of the City Council <br />FROM: Joel Hanson, City Administrator <br />DATE: August 8, 2005 <br />RE: Cingular Tower Request <br />Attached is the material we requested from Cingular at our Last meeting. The materials were not <br />received until Friday morning, so staff has not had a chance to do a thorough review of this <br />information. The materials attached are as follows: <br />• RF Data Spreadsheet <br />• Antenna Information/Specifications <br />• Cingular Linking Towers Map <br />• Cingular Linking Towers Data <br />• Little Canada Tower Inventory Map <br />• Little Canada Tower Inventory Data <br />• Road Map — Route Used for Inventory <br />• Proposed Site and Alternate Towers Data <br />• Donovan Tower Photo <br />• Letter from T- Mobile on Donovan Tower (Tower at Full Capacity) <br />• Ramsey County Tower Photo Sheet <br />• Qwest Tower Photo Sheet (no photos provided) <br />• Proposed CUP Language to Protect Water Tower Site <br />• 3 Party Analysis from Owl Engineering <br />• Coverage Map with Proposed Spruce Street Tower but without Water Tower <br />An engineering letter from Cingular has not been provided as required by our ordinance. Also, <br />the third party analysis performed by Owl Engineering was done at the request of Cingular, not <br />City Staff. We did not secure a third party consultant as no information had been submitted for <br />us to review until August 5111. Owl Engineering did attempt to contact us about serving in the <br />third party capacity, but ( did not return the call due to the lack of information I had for them (or <br />anyone else) to review. Lastly, the projections done at the Donovan site were at a Height lower <br />than we requested (90 feet versus 120 feet). i do not know how the chosen height was arrived at. <br />However, (his may be moot given the letter from T- Mobile. <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.