My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-2005 Additions
>
City Council Packets
>
2000-2009
>
2005
>
08-24-2005 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2014 2:07:54 PM
Creation date
4/24/2012 11:38:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contractor who installed the well in 1985 and he confirmed that the plastic pipe in <br />place is rated at 100 p.s.i., which would work in our system. The homeowner has <br />agreed to sign a document accepting all responsibility if the line fails and he also <br />agreed to disclose this information to any future potential owners of the property. <br />The city will keep this documentation on file at city hall so there is public record <br />of it as well. <br />I would recommend that we allow the contractor to tie into the existing plastic pipe so <br />that all of the potential problems with the first scenario could be avoided. There is too <br />much at risk with both his garage and driveway facing the possibility of being excavated. <br />We will require the contractor to use a brass barb connection between the plastic and <br />copper to minimize the chance of a bad connection. If all of our guidelines are met, I <br />believe we could make things easier on everyone involved if we allow the connection to <br />the plastic line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.