My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
04-14-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2014 8:39:29 AM
Creation date
4/25/2012 2:51:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page(3onstruction Scope of Work 594 East Co Road B21.xls <br />DIVISION 5 METALS <br />DIVISION 6 WOOD <br />Finish Carpentry <br />06200 <br />Remove and replace rotted front (3) porch support & trim <br />$500.00 <br />Provide larger exterior win. & dr. trim <br />$300.00 <br />Provide new vinyl siding, and 36" aluminum sofit and <br />7 -1/2" facia <br />$5,500.00 <br />Provide new wood front deck/porch railing <br />$1,600.00 <br />Clean and seal and provide new membrane, drip edge <br />and wood decking.© 6' x 24' the front porch <br />$1,400.00 <br />Rebuild 3 season porch, new cedar, screen and create <br />a 24" perimeter wall <br />$1,500.00 <br />Remove & replace cove in the lower level <br />$50.00 <br />Provide baseboard in lower level <br />$350.00 <br />Relocate water heater and install door to mech room <br />from the lower family room. <br />$400.00 <br />DIVISION 7 THERMAL AND MOISTURE PROTECTION <br />Insulation <br />07210 <br />Seal the attic bypasses, upgrade insulation in attic to <br />R -44 and insulate and seal the attic access. <br />$600.00 <br />Insulate open areas of rim joist in the basement <br />$100.00 <br />Asphalt Shingle <br />Roofing <br />Provide roofing on rear shed <br />$1oo.00 <br />07310 <br />Siding & <br />Accessories <br />Install siding on rear shed (material on site) <br />$200.00 <br />07460 <br />DIVISION 8 DOORS AND WINDOWS <br />Entry Doors <br />& Frames <br />08110 <br />Remove & replace (2) front ext doors, hardware & trim <br />$800.0o <br />Provide patio door © 3 season porch <br />$1,200.00 <br />Provide patio door @ dining <br />$1,200.00 <br />Provide new gar service door, hdwr, closure and trim <br />$350.00 <br />Remove & replace the interior door hardware <br />$300.00 <br />Overhead Garage <br />Door <br />Provide raised panel steel overhead garage door <br />$650.00 <br />08360 <br />Provide 1/2 horse garage door opener <br />$350.00 <br />Aluminum Clad <br />Page(3onstruction Scope of Work 594 East Co Road B21.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.