My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
02-25-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2012 2:32:48 PM
Creation date
4/30/2012 2:22:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP Name: Storm System Maintenance <br />Unique ID: 6 -04 -R <br />MCM: #6 — Pollution Prevention /Good Housekeeping For <br />Municipal Operations <br />ok Little Carcid <br />CCMMunmr MCC <br />1953 - 9CO3 <br />Description: <br />This program will result in timely maintenance of the City's storm system components inspected <br />under the program described in BMP 6 -03 -R. <br />Justification: The proper maintenance of' storm water BMPs Is required to assure the proper <br />operation and perfoinrance. This is a required BMP under Permit Part V.G.6.b. <br />Responsible Staff /Position: <br />Public Works Director 651.766.4049 <br />Measurable Goals: <br />1. inspect and maintain system components according to the schedule specified (and as may be <br />revised) in BMP 6 -03 -R. <br />2. Annually track the number of system components maintained and the general condition of the <br />BMP. <br />3. Annually estimate the volume or weight of material removed from structural BMPs folio <br />maintenance event. <br />4. Re- evaluate maintenance schedule following annual reporting results in March 2005 and March <br />2007. <br />implementation Schedule: <br />1. See measurable goals descriptions. <br />Education Program /Public Outreach Component: <br />1. Audience or audiences: City staff involved in storm water and water resource inspection and <br />maintenance activities. <br />2. Increased awareness: The program will make known the importance of the inspection program is <br />critical to the storm water system maintenance program (BMP 6- 04 -R). <br />Annual Reporting Items: <br />1. Summarize attainment of measurable goals. <br />Citv on Little <br />V'iarcu 2004 <br />ada. MN- <br />EMI) <br />AN <br />Page NICM r.= (i- <br />- 5 9 - <br />Permit No. MN 8850000 <br />NPD ES Phase II Permit NOI <br />
The URL can be used to link to this page
Your browser does not support the video tag.