My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-25-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
02-25-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2012 2:32:48 PM
Creation date
4/30/2012 2:22:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cu <br />E <br />0 <br />U <br />0 <br />N <br />0) <br />cnd <br />0 <br />U <br />Measurable Goal(s) <br />ct Erosion Control Program <br />notnn Metro Watershed Dist <br />Discuss issue at Ramsey - Washington <br />Public Works Forum. Current discussions <br />have irproved understanding of water <br />quality impacts of erosion and sediment <br />control. <br />7 sites. See BMP 5 -04 for breakdown. <br />m <br />O <br />m <br />0 <br />m <br />0 <br />m <br />U <br />Work with RWMWD to ensure compliance <br />with WD permit requirements and support <br />their inspection and enforcement process. <br />Request plan review and inspection results <br />from RWMWD annually for projects in the <br />City. <br />1) Work with RWMWD to review compliance with W0 permit for all construction sites greater <br />than 1 acre. <br />2) Request plan review and inspection results from RWMWD annually for projects in the City. <br />On -going program. Discussions have <br />improved staff understanding of importance <br />of erosion and sediment control. <br />63 sites- <br />On -going program. Discussions have <br />improved staff understanding of importance <br />of erosion and sediment control. <br />0 <br />z <br />m <br />C <br />0 <br />0 <br />m <br />11 <br />m <br />11 <br />0 <br />0 <br />Review all development plans for all sites <br />for which a building permit is required and <br />applied for. <br />Track and record the number of <br />sites /projects reviewed annually. <br />Identify sites where additional storm water <br />BMPs are needed or recommended and <br />make recommendations to the owner. <br />Track and record the number and type of <br />BMPs installed that go beyond the <br />minimum code requirements. <br />N <br />4) Track and record the number and type of BMPs installed that go beyond the minimum code <br />requirements annually. <br />0 <br />a <br />w <br />w <br />ehic <br />5 <br />IPs <br />U <br />0 <br />n <br />w <br />`0 <br />n <br />0 <br />0 <br />0 <br />0 <br />a <br />0 <br />0 <br />I- <br />N <br />0 <br />0 <br />9F <br />Not started yet. <br />z <br />March 10, 2007 <br />March 10, 2007 <br />m <br />o 0 <br />E <br />0 L0 <br />o E <br />a <br />c 9 <br />0 i <br />E <br />V 0 <br />m0 <br />N <br />N 0 N <br />o E <br />N a a <br />0 a 9 <br />tt E 8 <br />n <br />m <br />0 <br />al <br />N <br />0 <br />a <br />ce <br />0 <br />0 <br />E <br />0 <br />9 <br />od to track complaints <br />E <br />Oa <br />0 <br />m <br />c <br />E <br />0 <br />E <br />E <br />0 <br />n <br />E <br />0 <br />m <br />w 00 <br />00 <br />Implement new complaint program in April 2007. <br />- 1 3 - <br />c <br />ca <br />E <br />a <br />O <br />I <br />cd <br />as <br />as <br />0 <br />E <br />a <br />0 <br />m <br />0 <br />0 <br />3 <br />z <br />ftS <br />O <br />0 <br />E <br />0) <br />c0 <br />m` <br />O <br />U1 <br />O <br />0) <br />0 <br />0 <br />a <br />00 <br />xe <br />U <br />March 10, 2004 <br />as <br />`0 <br />0 <br />0 <br />U <br />a <br />a <br />O N <br />8 <br />N <br />w <br />co 0 <br />2 <br />A <br />o <br />4 <br />0) <br />d to each BMP 5 -02 -R to 5 -04. <br />"w <br />March 10, 2005 <br />March 10, 2006 <br />March 10, 2007 <br />March 10, 2008 <br />U <br />-6 O <br />cwi <br />c 00 0- <br />c 0 <br />:8 w <br />0 95U <br />T 0 <br />t.3 <br />0 E <br />C'= N 0 <br />" <br />a <br />C m N <br />3 `c E <br />v a <br />� o ` n E <br />0 <br />c <br />0 <br />•0 <br />coo <br />0 (0 <br />O <br />U <br />w j <br />d <br />E V <br />E 2 <br />U <br />0 <br />n <br />0 <br />m <br />c <br />C <br />0 <br />E <br />o 00 <br />C 0 <br />0 8 <br />m a <br />Post Construction Runoff Control Ordinance <br />a <br />o <br />co <br />U <br />0 <br />8 <br />v <br />C <br />T 0 O <br />0 N <br />10 o <br />0 m t <br />r r <br />N <br />c <br />0 n <br />yU <br />U 5 <br />L C <br />0 3 <br />8 8 <br />c E <br />m m <br />0 c E <br />E <br />o w <br />2 a <br />U 0 <br />c 8 <br />v <br />3 h <br />'> 0 <br />08 <br />2) Complete background and draft ordinance structure by March 10, 2006. <br />3) Begin formal ordinance development process by March 10, 2007. <br />Complete process and Council approval by March 10, 2008. <br />
The URL can be used to link to this page
Your browser does not support the video tag.