Laserfiche WebLink
3. Illicit discharge detection and elimination <br />Schroeder Greg- !f Public Works <br />Contact Last Name First Name Department <br />'5 Little Canada Road <br />..tailing Address <br />Little Canada <br />MN 55117 <br />C iry <br />651.766.4049 <br />State Zip Code <br />Greg. schroeder @ci.little- canada.mn.us <br />telephone (include area code) E -Mail Address <br />a) <br />c) <br />Have Best Management Practices (BMPs) that wi is minimum <br />control measure been planned or developed? <br />Have measurable goals for each BMP for this minimum control measure been planned or <br />developed? <br />Has an estimated timeline for implementing each BMP for this minimum control <br />measure been planned or developed? Timelines should include, in narrative or nume <br />form, the months and years required actions will occur, interim milestones, and <br />frequency of action, as appropriate. <br />Have the educational components for this min <br />developed? <br />Provide a brief description of the plan to complete any requ <br />11 be implemented for th <br />d) imum control measure been planned or <br />cal <br />e) requirements marked "No" above. <br />4. Construction site storm water runoff control measures <br />Schroeder Greg <br />Public Works <br />ZYes ❑No <br />EYes ❑No <br />]Yes ❑No <br />ZYes ❑No <br />let Last Name First Nance Department <br />J Little Canada Road <br />Mailing Address <br />Little Canada <br />MN 55117 <br />City State Zip Code <br />651.766.4049 greg. Schroeder @.ci.little- canada.nur.us <br />Pelepitone (include area coda E-Mail Address <br />a) Have Best Management Practices (BMPs) that will be implemented for this minimum <br />control measure been planned or developed? <br />D) Have measurable goals for each BMP for this minimum control measure been planned or <br />developed? <br />) Has an estimated timeline for implementing each BMP for this minimum control <br />measure been planned or developed? Timelines should include, in narrative or numerical <br />form, the months and years required actions will occur, interim milestones, and <br />frequency of action, as appropriate. <br />d) Have the educational components for this minimum control measure been planned or <br />developed? <br />Provide a brief description of the plan to complete any requirements marked "No" above. <br />.,) <br />. Post- construction storm water management measures <br />roeder Greg <br />Public Works <br />ZYes ONO <br />Yes ❑No <br />ZYes ❑No <br />9 <br />Yes ❑No <br />Las1 Name ritst ?lame Department <br />1 -5 Line Canada Road <br />VIal11n° tlaress <br />pc '.: MSJ!;lorm -Voter P.:rmn. A uniie :won • <br />21- <br />