My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
01-28-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2012 2:41:34 PM
Creation date
5/1/2012 2:35:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Received: 11/26/03 3:29PM; 651 2862111 -> C I TITLE INC; Page 2 <br />NOV -26 -2003 WED 03:02 PM NPOWER FAX NO 651 2862111 <br />Cummins NPower, LLC <br />Box 64578 <br />St. Paul, Minnesota <br />55164.0578 <br />11/26/2003 <br />0 Title <br />Attention: Norma Roszak <br />4 -4., <br />P. 02 <br />In a conversation with Greg Wilson we discussed the exercise recommend: Lions for the DGFA Serial <br />Number A020326325 generator set started by an automatic transfer switch The Cummins / Onan <br />Operator's Manual suggests the following information: "Generator sets on continuous standby must be able <br />to go from a cold start to being fully operational in a matter of seconds. Ti : s can impose a severe burden <br />on engine parts. Regular exercising keeps engine parts lubricated, prevent: oxidation of electrical contacts <br />and in general helps provide reliable engine starting. Exercise the gencratl r get at least once a week for a <br />minimum of 30 minutes with load so the engine reaches normal operating :1:mperature." <br />The above recommendation is for optimum performance of the generator a :.d transfer switch system. <br />When these recommendations are reduced the reliability of the equipment reduced. <br />Business or environmental reasons may call for reducing the exercise pent ds. When the customer makes <br />this decision, they must accept the fact that the reliability of the equipment 'nay be reduced. We are aware <br />of customers who run their generator sets at two times a month and have g 'od success. <br />If faced with a situation where the generator set is not exercised as recomn tended, often times accelerated <br />maintenance will help increase reliability. <br />We fully support the factory recommendations but are trying to provide an alternative where exercising <br />generator time may conflict with local ordinances. <br />Regards, <br />AlJ66obson <br />Distributor Pield Service Engineer <br />Cummins NPower <br />Phone: 651 - 636 -1000 <br />Facsimile: 651-286-2111 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.