Laserfiche WebLink
Schedule A <br />City of Little Canada <br />Project Rate Schedule <br />Project work shall be completed at the hourly rate shown in Schedule B up to the <br />following: <br />Construction Cost <br />Below $100,000 <br />$100,000 - $250,000 <br />$250,000 - $500,000 <br />Above $500,000 <br />Hourly <br />Hourly / maximum 25.0% of const <br />Hourly / maximum 22.5% of const <br />Hourly / maximum 20.0% of const <br />cost <br />cost <br />cost <br />Project work would include one informational meeting, feasibility preparation, <br />improvement hearing, design, construction inspection, construction staking, and <br />construction administration. The need for right -of -way would be identified within the <br />hourly /maximum cost, but the actual cost of assisting in the acquisitions and preparation <br />of the easement descriptions and exhibits would be at an additional hourly cost. <br />Subconsultant work such as geotechnical services and other reimbursable expenses <br />would also be in addition to the maximum not to exceed and billed at cost. <br />- 1 4 - <br />