My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-15-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
12-15-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 1:40:59 PM
Creation date
5/8/2012 1:31:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey - Washington Metro <br />Watershed District <br />1902 East County Road B <br />Maplewood, MN 55109 <br />(651) 704 -2089 <br />PERMIT <br />04 -44 <br />Pursuant to the Rules and Regulations of the Ramsey - Washington Metro Watershed District policies and standards, and <br />based upon the statements and information contained in the permit application, letter, maps, and plans submitted by the <br />applicant and other supporting data, all of which are made a part hereof by reference, permission is hereby granted to the <br />applicant named below to conduct the grading, filling, and /or drainage activity described below: <br />Project Name <br />Gervais Hills <br />Applicant Name Applicants Company <br />Jon Whitcomb Wesley Investments, Inc. <br />Telephone Number <br />651 - 430 -7797 <br />Applicants Address City <br />275 Third Street Stillwater <br />State <br />MN <br />Zip Code <br />55082 <br />Authorized to Complete project per plans and special provisions, <br />Purpose of Permit <br />Residential <br />Expire Date of Permit <br />10/12/2005 <br />Property Description <br />South of County Rd B2, north of Hwy 36, East of Viking Drive, Little Canada <br />County <br />Ramsey <br />This Permit is granted subject to the following GENERAL and SPECIAL PROVISIONS <br />General Provisions <br />1. Construction shall be in accordance with the plans submitted to the District as part of the record for this <br />project. <br />2. The site soil erosion and sediment control facilities shall be installed and maintained to conform with the <br />standards specified in the RAMSEY COUNTY EROSION AND SEDIMENT CONTROL HANDBOOK. <br />3. The site soil erosion and sediment control facilities for rough grading phase of the project must be installed <br />prior to any site grading operation. The District's Technician must be notified once these facilities are <br />installed. Grading operation shall not begin until the District Technician approves the installed facilities, <br />4. All grading operations shall be conducted in a manner to minimize the potential for site erosion. <br />i. In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and <br />intakes) the erosion control facilities shall be backed by a stabilization structure to protect those facilities <br />from the concentrated flows. The stabilization structures, such as snow fence, shall be approved by the <br />District Technician. <br />6. Any damaged silt fence or other erosion control facility shall be restored to their originally installed condition <br />daily. <br />7. All areas disturbed during construction shall be restored as soon as possible. Any areas that have been <br />finish graded and areas that have been disturbed, but have no active grading, shall be seeded and mulched <br />within 14 days. All mulch material shall be disced into the soil in a direction perpendicular to the stcrmwater <br />flow over such areas. Slopes 3:1 or steeper must be either seeded and covered with an erosion blanket <br />product or mulched with a tackifying agent rather than discing the mulch. <br />
The URL can be used to link to this page
Your browser does not support the video tag.