Laserfiche WebLink
04 -44 <br />Special Provisions <br />t A phasing plan of the grading shall be submitted to the District. All ponds and slopes <br />leading to the ponds and swates shall be graded first and then seeded and covered within 24 <br />hours from final grading. <br />2. The ponds shall be graded to drain at all times throughout the phases of construction. If the <br />pipes between the ponds will not be installed during grading of the ponds, a swale shall be <br />shown between thorn to drain one from the other. <br />3. The erosion and sediment control plan shall show various phases of construction and the <br />various BMPs that will be used with each phase. <br />4, The erosion and sediment control plan shall show the use of a rock berm and silt fence or an <br />equivalent on the upstream side 01 the pipes the outlet under County Road B2. <br />5. The erosion and sediment control plan shall show the use of flotation slit fence or an <br />equivalent on the downstream side of the pipes that outlet under County Road 82. <br />6. Catch basin locations shall call out the need for inlet protection after placement of storm, <br />sewer structures. A detail of the chosen method of inlet protection shall be added to the <br />plans. <br />S'Sd WUSP:OT t'OEk ET '4•30 <br />Z60'c -h02_- :-T 5 .7N XtJ.J GPI ONISM NOl9N I HSUM- ABSWH4 : WOHJ <br />