Laserfiche WebLink
DESCRIPTION <br />31 2504.536 INSTALL SIGN <br />32 2564.603 4' DOUBLE SOLID LINE YELLOW-EPDXY <br />33 2564.603 4" SOLID LINE WHITE-EPDXY <br />34 SPEC DIRECTIONAL BORE 8" HOPE (DIPS) <br />35 SPEC 14" STEEL CASING PIPE (JACKED) <br />36 SPEC 12 "X0 "WET TAPW /VALVE <br />37 SPEC BITUMINOUS CURB <br />SCHEDULE 6.0- TWIN LAKE BOULEVARD - TOTAL <br />BID SUMMARY <br />SCHEDULE 1.0- MIDDLE STREET STORM SEWER AND ROAD - TOTAL <br />SCHEDULE 2.0- MIDDLE STREET SANITARY SEWER - TOTAL <br />SCHEDULE 3.0 - MIDDLE STREET WATERMAIN - TOTAL <br />SCHEDULE 4,0- TWIN LAKE ROAD/TRAIL - TOTAL <br />SCHEDULE 5.0- TWIN LAKE ROAD /TRAIL WATERMAIN - TOTAL <br />SCHEDULE 6.0- TWIN LAKE BOULEVARD - TOTAL <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br />UNIT <br />.,...... .,.,.:� <br />PRICE <br />EACH 1 589.25 <br />LF 700 52.00 <br />LF 700 51.50 <br />LF 1,970 531.00 <br />LF 360 5200.00 <br />EACH 1 $2,400.00 <br />LE 750 54.20 <br />IS PERIOD <br />THIS PERIOD r TOTAL. TO PATE' <br />OTY AMOUNT <br />0.00 50.00 0.00 50.00 <br />0.00 50.00 0.00 S000 <br />0.00 50.00 0.00 $0.00 <br />0.00 50.00 2107.00 565,317 00 <br />0.00 50.00 381.00 $76,200.00 <br />0.00 $0.00 1.00 $2,400.00 <br />0.00 50.00 0.00 $0.00 <br />512,019.38 $183,510.65 <br />TOTAL THIS PERIOD <br />$1,789.52 <br />50.00 <br />50.00 <br />5127,543.45 <br />551,090.65 <br />512,019.38 <br />5102,443.00 <br />TOTAL TO DATE <br />5997,554 46 ' 1/ <br />549,877 72 '1 16 <br />50.00 <br />5000 <br />5764 855 <br />MATERIAL ON SITE <br />$PREVIOUS PAYMEN TS <br />:AMOUNT DUE <br />O:IProj /816600JI00'l1IPMIaI Payments /Pay Estimate /14 <br />59 62215 <br />S0.00 <br />50.00 <br />5182 820 85 <br />5182.820 85 <br />TOTAL TO DATE <br />5149,352.61 <br />512,380.65 / <br />527,085.60 <br />$382,08169 <br />$243,14305 f <br />$183,510.65 / <br />5997,554.46 d <br />tk- <br />