Laserfiche WebLink
HOWARD R. GREEN COMPANY: PROJECT BUDGETING WORKSHEET SUMMARY OF COSTS $ <br />DIRECT COSTS: 117.00 <br />SUBTOTAL: 5,404.82 <br />CONTINGENCY (15 %): 766.35 <br />N. <br />m <br />0 <br />U <br />o <br />1170011 <br />OR <br />o <br />net LABOR: 5,109.00 <br />w <br />ill <br />F <br />Q <br />0 <br />o <br />DIRECT AS % OF TOTAL FEE If <br />n <br />f- <br />2 <br />TOTAL DIRECT COSTS: <br />W <br />!— <br />1Mileage Survey 1 <br />PROJECT NUMBER: 0 <br />M <br />N <br />o <br />N <br />V <br />0)(-0c0 <br />m <br />m <br />o co • <br />2 <br />m <br />ro <br />co <br />m <br />LAND <br />SURV <br />O <br />78 <br />5109 <br />LABOR <br />BUDGET BY <br />TASK ($) <br />786, <br />to <br />(0 <br />a) <br />co <br />N <br />co <br />N <br />(IUTAL HOURS <br />COST PER HOUR (CHARGE -OUT RATE) <br />(TOTAL LABOR COST <br />% OF TOTAL LABOR COST <br />DESCRIPTION OF TASK <br />liStaking for Twin Lakes Blvd <br />111000 Edge of Bit Staking <br />(Open cut portion of Twin Lake Blvd 58 +90 to 65 +20 = 630 feet. <br />Edge of bit stakes in curve = 20 stakes). <br />12000 Storm Sewer Staking <br />(1 connect with 10 structures) <br />13000 Curb & Gutter Staking <br />(1000 feet with two intersections) <br />-6 <br />Proj Budget Wksht - Twin Lakes.xls <br />N <br />O <br />