Laserfiche WebLink
Aug 26 04 07:53a ,Ion Whitcomb <br />AUG 25 '04 OE 35PM BRAUN INTERTEC P.3/23 <br />651 -430 -0029 P.3 <br />BRAUN <br />INTERTEC <br />Braun Inienee Ca,poratan <br />3d5 tog Ro:eiown A.envc <br />Si. ?cu, MN 86 117 <br />May 2I, 2004 Project SP-04-03734 <br />Mr. Jon Whitcomb <br />Wesley investment, Inc. <br />275 South 3'a Street <br />, Suite 302 <br />Stillwater, MN 55082 <br />Dear Mr. Whitcomb: <br />.Phone 651.687 32a.I <br />Fux: 651.487.1 812 <br />Web- UmunlnMneemm <br />Re: Geotechnical Evaluation, Proposed Residential Development, Properties at 692 and 696 <br />County Road B2, tide Canada, Minnesota. <br />The geotechnical evaluation for the above- referenced project has been completed. This letter <br />summarizes otur results and recommendations. <br />Summary of Results <br />Three of our four borings encountered about 9 feet of swamp and lacustrine (lake) deposits over <br />clayey glacial till that extended to the termination depths of the borings, The remaining boring, <br />drilled in topographically higher ground towards the south end of the site, encountered glacial till <br />beneath about 1 -foot of topsoil. <br />The swamp deposits consisted of slightly organic clay, organic silt and peat. The lake deposits <br />cnncieted of sEzhtly org �ic zi3ty sane,' and clayey sand that were . <br />. ._._.__ _. _.. _.. -.r ... �.,....- w., : o..!.m .�.<.., clayey oovu that vGi f loose to iveuC, 'The giaciai <br />rill consisted of sandy lean clay and clayey sand that was locally rather soft, but mostly rather stiff <br />to stiff <br />Groundwater was observed in two of the four borings at depths of' about 4 % to 5 feet, <br />corresponding to elevations of approximately 857 to 859 1/2. Standing water was observed in the <br />ditch located within the northwest portion of the site at about elevation 861, and the normal <br />water elevation of nearby Gervais Lake is 353. <br />Summary of Recommendations <br />The swamp and lake deposits are considered compressible and unsuitable for support of <br />residential foundations. Where present below proposed building areas, we recommend that they <br />be excavated and replaced with compacted engineered backfill. Removal and replacement of <br />these organic soils with compacted mineral soils is also recommended for utility support. <br />Although consideration could be given to leaving the organic soils in -place (at- depth) below the <br />proposed street, given that corrective excavations will be needed for utilities placed, presumably, <br />within the street, we recommend removing, organic soils from below the proposed street as well. <br />Based on our water level observations and nearby ditch and lake levels, we estimate that <br />groundwater elevations range from about 857 to 86L At these elevations, groundwater will <br />impact construction, as excavations to remove organic materials will extend below groundwater. <br />We recommend that lowest floor elevations be placed at least 4 feet above groundwater, and at <br />least two feet above the I00 -year flood elevation of nearby ponds and lakes. <br />_ _ .. ....... _......._..- _.. Prn.,,dnl" u.4ineerin= mid :n. n�,nmenrat .nlunnit <mre 1057 <br />