My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-2004 Council Agenda
>
City Council Packets
>
2000-2009
>
2004
>
09-08-2004 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2014 8:58:24 AM
Creation date
5/9/2012 10:48:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`V G /1a! 2Ok %/ cee walla <br />515 Little Canada Road, Little Canada, MN 55117-1600 <br />(651) 766 -4029 / FAX: (651) 766-4048 <br />wwv.ci.little- canada.mn.us <br />MEMORANDUM <br />TO: Mayor and members of the City Council <br />FROM: Greg Schroeder, Public Works Director <br />DATE: September 2, 2004 <br />RE: Permit to Construct Storm Water Pond <br />MNDOT Unweave the Weave <br />MAYOR <br />Michael I. Fahey <br />COUNCIL <br />Jim LaValle <br />Matt Anderson <br />Rick Montour <br />Bill I3lesener <br />ADIVIINISClL11'O2 <br />Joel R. Hanson <br />When Drywall Supply developed the old Knox property they were required to, and built, the storm water <br />pond at the south end of their property as shown on the attached sketch. As part of MNDOT's Unweave <br />the Weave project they are to construct a storm water pond (called Jiggs Pond) between the new District 82 <br />building and the Levitz building, also, as shown on the attached sketch. During the construction of Jiggs <br />pond, MNDOT has agreed (at no cost) to reshape Drywall Supply pond and remove the berm that would <br />separate the ponds. This would result better flow and treatment characteristics of the two ponds. <br />However, MNDOT can not perform the above work unless we grant them a no cost (80) Temporary Permit <br />to Construct, that would allow them to go onto the City of Little Canada's drainage easement to do the <br />necessary work. A copy of the temporary permit to construct is attached for your reference. <br />Based on the above, staff recommends the no cost Temporary Permit to Construct be appproved. <br />H:vGrcgSVCarspondenee'.Grcg S 200-I‘Pcnint to construct pond (tin maava the AVc; c).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.