Laserfiche WebLink
uu /1U /UZ TUE 13:04 TEL 6517300840 PROTERRAJOESIGN <br />T:Jliams <br />WILLIAMS ENERGY SERVICES <br />INTER - OFFICE CORRESPONDENCE <br />)ATE: September 3, 2002 <br />:0: Don Jensen <br />rROM: Andrew Livingston <br />;OBJECT: . 280:M063 The Preserve <br />Tract3318 <br />Ramsey County, Minnesota <br />%FE: 280- 2002 -08978 <br />A. review of the drawings submitted by ProTerra Design Associates, Inc. showing WPL f I -6 ", #2 -6 ", #4 -12" lines <br />:rossing the subject development has been completed. In particular, the drawings titled "The Preserve Little <br />Canada, Minnesota ", Drawing Nos: C2.I, C3.1 C4.1, LI..1':and Metro Land Surveying and Engineering Drawings <br />-Topo and Boundary" and "Preliminary Plat" as well as Williams Pipeline Company (WPL) - Alignment Drawing <br />No's. DMA - 043 -49, and DMA - 043 -49D were evaluated. It was determined -that the # 1 -6" line in this area bctones <br />to MCI -World Com. The discussions to follow will therefore be limited to the remaining #2 -6" and #4 -12" lines. <br />•Ptease.note: All pipeline engineering station numbers (ESN).stated below pertain Ro the #4.12" ESN and are <br />scaled from the drawings. <br />The first area dfconcern is the proposed Preserve Court road.viithin our pipeline Right of Way and running <br />parallel to our pipelines from pipeline ESN 13479 +02 to ESN 13474 +48. The distance front the edge of pavement <br />to our: #4 -12 ", which is the closest pipeline to it, varies from.18 feet to 31 feet. Due to the separation between the <br />road and our pipeline and the depth ofour line (approximately 3 feet), our line wil{ be out ofthc zone of any <br />additional stress resulting from the road construction. <br />The second area of concern is the proposed Preserve Trail road crossing the pipelines at our pipeline ESN <br />13470 +00. The proposed depth of cover at the crossing is'4 feet. Analyzing the induced stress due to external loads <br />using.Pisces.it was determined that the proposed road passcs all the criteria of API 1102 and is satisfactory. <br />Furthermore; the depth of cover noted above meets WPL minimum requirement a$ stated in our Encroachment <br />The third: area of concern is the distance between the pipeline and the proposed dwelling at Block 2, Lot 1. The <br />proposed distance is approximately 26 feet from the #4-12 •pipeline. D.O.T Part 195 Paragraph 210 specifics a <br />minimum distance of 50 feet between a pipeline and dwelling or a minimum over of 48 inches if the distance <br />cannot be obtained. Our easement at this point extends.to the north property line of tract 3318B approximately 16 <br />feet north of the # 4 -12 ". While we have no control over this area since it is outside of our right of way easement it <br />is highly recommended that the placement of the dwelling on this lot be oriented to provide the maximum <br />separation between it and our pipeline. <br />The final area of concern is the landscaping over the pipeline right of way. WPL IEncroachment Guidelines state <br />that no trees orshrubs 3 feet or taller at maturity are permitted on our right -of -way. This would include the area on <br />thesouth side of the entrance road to Road ESN 5 +65 and the road crossing at Preserve Trail within the limits of <br />2002 <br />