Laserfiche WebLink
PROJECT HISTORY <br />❑ Residential Streets <br />❑ City's 2003 Capital Improvement Plan <br />❑ Street Condition <br />• 60 Feet of Right -of -Way <br />> 28 -foot Urban Section <br />> Surmountable Concrete Curb and Gutter <br />❑ Storm Sewer <br />> Existing System Serves Street <br />❑ Watermain <br />> Runs Entire Length of Street <br />❑ Sanitary Sewer <br />> Runs Along the Entire Length of Street. <br />O: \PROJ \819690) \0030 \Info meeting SAVAGE NORTH NOV14.doc <br />