Laserfiche WebLink
PROPOSED IMPROVEMENTS <br />❑ Right -of -Way <br />D Maintain Existing Width <br />❑ Street <br />D Reconstruct as 28 foot Urban Section <br />D Estimated Street Construction <br />• 8 Inches of Aggregate Base <br />• 2 Inches of Bituminous Base <br />• 1-% inches of bituminous wear <br />D Concrete Curb and Gutter <br />• Maintain Existing Curb on West Side <br />• Install Barrier Concrete Curb on East Side <br />o Storm Drainage <br />D Addition of Catch Basins Along New East Side Curb Line <br />D Fill Boulevard Ditches <br />0: \PROJ \819690) \0030 \Info meeting SAVAGE SOUTH NOV14.doc <br />