Laserfiche WebLink
PROPOSED IMPROVEMENTS <br />a Right -of -Way <br />D Maintain Existing Width <br />o Street <br />D Reconstruct as 28 foot Urban Section <br />➢ Estimated Street Construction <br />• 8 Inches of Aggregate Base <br />• 2 Inches of Bituminous Base <br />• 1 -' /2 inches of bituminous wear <br />D Concrete Curb and Gutter <br />• Maintain Existing Curb on West Side <br />• Install Barrier Concrete Curb on East Side <br />❑ Storm Drainage <br />> Addition of Catch Basins Along New East Side Curb Line <br />D Fill Boulevard Ditches <br />O: \PROD \819690J \0030 \Info meeting SAVAGE SOUTH NOV14.doc <br />