My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-2002 Council Agenda
>
City Council Packets
>
2000-2009
>
2002
>
06-12-2002 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 2:03:05 PM
Creation date
5/14/2012 1:53:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9'21W ee771204 <br />515 Little Canada Road, Little Canada, MN 55117 -1600 <br />(651) 766 -4029 / FAX: (651) 766 -4048 <br />www.ci.little-canada.mn.us <br />MEMORANDUM <br />TO: Mayor Fahey & Members of the City Council <br />FROM:: Greg Schroeder, Public Works Director <br />DATE: June 6, 2002 <br />RE: 2002 Street and Utility Improvements <br />MAYOR <br />Michael 1. Fahey <br />COUNCIL <br />Beverly Scalze <br />Jim LaValle <br />Matt Anderson <br />Rick Montour <br />ADMINISTRATOR <br />Joel R. Hanson <br />Background: <br />In accordance with the feasibility study, plans and specification, the 2002 Street and Utility <br />Improvements project was advertised and bids were opened on Wednesday June 5, 2202. This <br />project includes the reconstruction of Sextant and Stark Streets; the construction of Market Place <br />Drive; repair of Ryan Drive; Construction of Rondeau Park; parking lot paving; and the repair of <br />the sanitary sewer manhole at the intersection of LaBore Road and Edgerton Street. The <br />Engineers estimate for all of this work is $1,422,689. <br />Bids: <br />A total of 12 construction companies and 7 suppliers /subcontractors requested copies of the <br />plans and specifications. However, only one company, Palda and Sons, provided a bid. Palda <br />and Son's bid of $1,698,990.72 is approximately $276,301 over the Engineers estimate for this <br />work. A break down of their bid is as follows: <br />I- I:ACiregS \ Streets \2002 Street Improvements \2002 Me io.doc <br />FEASIBILITY <br />ENGINEER <br />ESTIMATE <br />BID <br />Sextant <br />$276,741.05 <br />$216,131.10 <br />$300,420.01 <br />Stark Street <br />$237,898.40 <br />$237,633.50 <br />$269,702.07 <br />Stark Manholes <br />$10,615.00 <br />$13,180.00 <br />$19,540.00 <br />Market Place Drive <br />$789,371.00 <br />$694,038.10 <br />$802,636.50 <br />Ryan Drive <br />$84,601.00 <br />$74,963.70 <br />$111,101.48 <br />Subtotal <br />$1,399,226.45 <br />$1,235,946.40 <br />$1,503,400.06 <br />Rondeau Park <br />$119,582.78 <br />$102,912.26 <br />Parking Lots <br />$47,535.00 <br />$70,593.53 <br />LaBore Rd./ <br />Edgerton Manhole <br />$19,625.00 <br />$22,084.87 <br />Total <br />51,422,689.18 <br />51,698,990.72 <br />I- I:ACiregS \ Streets \2002 Street Improvements \2002 Me io.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.