My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-2002 Council Agenda
>
City Council Packets
>
2000-2009
>
2002
>
03-27-2002 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2012 2:53:08 PM
Creation date
5/14/2012 2:36:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rice Street Crossings - Preferred Concept Two Implementation (DR,IF7) <br />'Estimate of Public Infrastructure Costs <br />Quantity <br />Unit <br />Unit Price <br />Category Subtotal <br />Category Total <br />..ater <br />12" pipe <br />Sewer <br />3200 <br />LF <br />35.00 <br />8" pipe 3200 LF 25.00 <br />Storm Sewer <br />18" pipe 2500 LF 50.00 <br />Retention pond construction 1 EA 20000.00 <br />Land Acquisition cost 0.75 AC 20000.00 <br />Local Streets (includes Vadnais Blvd. reconstruction /relocation) <br />Curb and gutter LF 10.00 <br />Bituminous street paving SF 4.00 <br />Concrete walk SF 4.00 <br />Streetlights @ 80' OC EA 5000.00 <br />Trees @ 40' OC EA 400.00 <br />Tree grate @ 40' 00 EA 500.00 <br />Bench @ 200' OC EA 1500.00 <br />Trach receptacle @ 200' OC EA 1000.00 <br />Restoration (sod) SF 0.40 <br />3100 LF 377.40 <br />Vadnais Blvd. Enhancements (to match local street improvements - Ramsey County builds roadway) <br />Concrete walk SF 4.00 <br />Streetlights @ 80' OC <br />Trees @ 40' 00 <br />Tree grate @ 40' OC <br />Bench @ 200' OC <br />Trach receptacle @ 200' OC <br />Rice St eet <br />Concrete walk <br />Streetlights @ 100' OC <br />Trees @ 40' OC <br />Town Square <br />Concrete walk @ 6' width <br />Lights <br />Trees <br />Bench <br />Trash Receptacles <br />Fountain /Focal Point <br />Other Landscape <br />Sod <br />Irrigation <br />Loop Road Bridge <br />Parking Structure <br />Parking Ramp <br />Metro Transit contribution <br />Transit facilities w /in ramp <br />Rice St eet Bridge Enhancements <br />North Owasso /Country Road relocation <br />900 <br />2000 <br />900 <br />4 EA @ 5000 <br />12 EA @ 400 <br />8 EA @ 1500 <br />4 EA @ 1200 <br />1 EA @ 20000 <br />1 EA @ 10000 <br />500 SF @ 3.50 <br />625 SF @ 0.40 <br />560 spaces <br />1000 <br />EA <br />EA <br />EA <br />EA <br />EA <br />LF <br />LF <br />LF <br />EA <br />LF <br />SF <br />5,000 space <br />5000.00 <br />400.00 <br />500.00 <br />1500.00 <br />1000.00 <br />165.00 <br />4.00 <br />5000.00 <br />40.00 <br />204.00 <br />3600.00 <br />20000.00 <br />4800.00 <br />12000.00 <br />4800.00 <br />20000.00 <br />10000.00 <br />1750.00 <br />1850.00 <br />$8,400,000.00 <br />- $2,500,000.00 <br />500000 <br />425 <br />112000.00 <br />80000.00 <br />125000.00 <br />20000.00 <br />15000.00 <br />1169940.00 <br />148500.00 <br />408000.00 <br />125000,00 <br />$2,500,000.00 <br />$5,900,000.00 <br />500000.00 <br />$100,000.00 <br />$425,000.00 <br />$112,000.00 <br />$80,000.00 <br />$160,000.00 <br />$1,169,940.00 <br />$148,500.00 <br />$408,000.00 <br />$125,000.00 <br />$2,500,000.00 <br />$6,400,000.00 <br />$100,000.00 <br />$425,000.00 <br />Project Total <br />11,628,440.00 <br />Notes: Estimates assume no land acqusition costs except for off -site storm water pond <br />ii <br />Hosngton Koegler Group Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.