My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-24-2002 Additions
>
City Council Packets
>
2000-2009
>
2002
>
04-24-2002 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2012 8:09:00 AM
Creation date
5/15/2012 8:07:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drywall Supply, Inc. <br />Project No. BI3XXn02 =010B <br />April 24, 2002 <br />Page 3 <br />Remarks <br />As you requested, we currently plan to drill additional borings around the former Knox building. <br />The purpose of the borings is to evaluate: 1) the type of soil an which the building is supported, 2) <br />what soil corrections may have been needed below the building (particularly near its southeast <br />comer) and, 3) how or where the soils may make the transition to organic materials. <br />If you have questions about this letter, please call Keith Rosvold at (651) 487 -7012. <br />Sincerely, <br />Braun Intertec Corporation <br />Keith S. Rosvold, PE, PG <br />Principal Engineer - Geologist <br />c: Gary Germundsen (Griffin Companies) <br />City Administrator (City of Little Canada) <br />ksr;ig \rpts \b201ob.doc <br />7/7'd <br />8 <br />DaLd 1NI NfU21d Wd26:60 172 ddd <br />
The URL can be used to link to this page
Your browser does not support the video tag.