My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-27-2002 Council Agenda
>
City Council Packets
>
2000-2009
>
2002
>
02-27-2002 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2014 1:54:31 PM
Creation date
5/22/2012 2:37:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 14 '02 05 :34PM BRAUN INTERTEC <br />Drywall Supply, Inc. <br />BBXX- 02 -010A <br />January 29, 2002 <br />Page 12 <br />P. 16/24 <br />E.2. Reviewal of Design <br />This report is based on a limited amount of information. As such, a number of assumptions were <br />necessary to pernit us to make recommendations. For this reason it is recommended that we be <br />retained to review the geotechnical aspects of the designs and specifications. With the review, we <br />will evaluate whether any changes in design have affected the validity of our recommendations, and <br />whether our recommendations have been correctly interpreted and implemented in the designs and <br />specifications. <br />E.3. Groundwater FIuctuations <br />We made water level readings in the borings at the times and under the conditions stated on the <br />boring logs. These data were interpreted in the text of this report, The period of observation was <br />relatively short, and fluctuations in the groundwater level may occur due to rainfall, flooding, <br />irrigation, spring thaw, drainage, and other seasonal and annual factors not evident at the time the <br />observations were made. Design drawings and specifications and construction planning should <br />recognize the possibility of fluctuations. <br />E.4. Use of Report <br />This report is for the exclusive use of the addressee and the copied parties to usedor preparing <br />designs and construction documents. In the absence of our written approval, we make no <br />representation and assume no responsibility to other parties regarding this report. The data, analyses <br />and recommendations may not be appropriate for other purposes. We recommend that parties <br />contemplating other purposes contact us. <br />E.3_ Level of Care <br />'Services performed by Braun Intertec Corporation personnel for this project have been conducted in <br />a manner consistent with that level of care and skill ordinarily exercised by members of the <br />profession currently practicing in this area under similar budget and time restraints. No warranty, <br />expressed or implied, is made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.