Mar. 11. 2002 8 :57AM Stellar Concrete & Masonry No.7746 P. 2 <br />Utility Engineering Corporation <br />Page 2 <br />March 11, 2002 <br />Notes <br />Proposal based on receiving footing and slab suhgrades of 1 /10th fool balanced.. <br />This proposal includes only the items and quantities listed <br />When preparing a contract resulting from this proposal please include the following: "Stellar Concrete & <br />Masonry's proposal dated the above date and all terns and conditions upon it shall be considered a part <br />of this contract and shall supersede all conflicting terms and conditions." <br />Stellar will pickup project rubbish and place into dumpsters furnished by General Contractor, <br />For safety reasons Stellar crews will not work when the ambient temperature drops below zero. <br />Additional Project Parameters <br />Proposal based on five (5) day work week conmrencing on Monday, <br />Proposal based on one (1) mobilization for completion of entire scope of work. Additional mobilizations <br />will require compensation, <br />Proposal based on tailgate delivery of concrete to final placement location unless otherwise noted. <br />Building soil and air temperature to be a minimum of 55 degrees prior to slabs placement.. <br />Trucks must be able to deliver construction materials to their area of intended use without the aid of all - <br />wheel drive or auxiliary towing equipment.. Any costs associated with all -wheel drive or towing will be <br />billed as a change to the contract.. <br />Terms and Conditions <br />This proposal is valid for 30 calendar days,. <br />Stellar Concrete & Masonry will not be held responsible for delays in performance caused by delays due <br />to strikes, jurisdictional disputes, fires, acts of God, wars, or other circumstances reasonable beyond <br />Stellar's control. <br />This proposal assumes Builders' Risk insurance will be provided, without cost, to Stellar Concrete & <br />Masonry. <br />llewatering of any trenches or excavations are the responsibility of the Contractor excavating or <br />trenching,. <br />Floor tolerances shall be measured in accordance with ACT 1 17 4.5.6.1 and ASTM El155, <br />AEI invoices are Net 30 days, interest will accrue at 1'4 % per month on overdue invoices. <br />This PrnnncoI i< f.. n <br />