Laserfiche WebLink
ITEM <br />N0. <br />ITEM DESCRIPTION <br />UNIT <br />ORIGINAL CONTRACT <br />01Y. UNIT PRICE <br />THIS PERIOD <br />QTY. TOTAL PRICE <br />TOTAL TO DATE <br />CITY. TOTAL PRICE <br />8 <br />9 <br />10 <br />51 <br />23500.501 <br />2350501 <br />2573.502 <br />2573.53 <br />TYPE AIV9 WEAR COURSE MIXTURE <br />TYPELV3 NON WEARING COURSE MIXTURE (EASEL <br />SILT FENCE. TYPE MACHINE SLICED -. -,_ <br />ML[T PROTECTION(WIACOl <br />TON <br />TON <br />1.6 <br />EACH <br />140.00 <br />,.18000 <br />57800 <br />0.00 <br />S0.00 <br />0.00 <br />0.00 <br />0.00 <br />S000 <br />50.00 <br />52000 <br />82.85 <br />0,00 <br />0.00 <br />0,00 <br />,...._ S000 <br />5000 <br />$0,00 <br />5800.00 <br />516500 <br />50.00 <br />11 <br />295504 <br />.._...... _.._.___. <br />SEEDING (TYPE 270) <br />ST <br />,..1,00 <br />475.00 <br />SY <br />0.00 <br />$000 <br />OM <br />50.00 <br />13__2582.501 <br />50.00 <br />PAVEMENT MESSAGE (HANDICAPSYM) EPDXY <br />EACH <br />PEDESTRIAN CURD RAMP <br />$23175 <br />0.00 <br />60,00 <br />_- <br />50,00 <br />14 <br />2582502 <br />4' SOLID WHITE LINE - EPDXY <br />LE <br />„200 <br />720.00 <br />., <br />53.00 <br />0.00 <br />60.00 <br />0.00 <br />60.00 <br />15 <br />50.00 <br />DENSITY TEST IN PLACE <br />EACH <br />1.00 <br />S82.40 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />10 <br />_ _SPEC <br />SPEC <br />NUCLEAR BITUMINOUS DENSITY <br />EACH <br />6.00 <br />525.75 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />57 <br />SPEC <br />EXTRACTION /GRADATION <br />EACH <br />2,00 <br />S123.60 <br />0.00 <br />5000 <br />0.00 <br />50.00 <br />16 <br />SPEC <br />AIR VOIDS <br />EACH <br />2.00 <br />6523.601 0.00 <br />60.00 <br />0.00 <br />50.00 <br />sCHEOULE 6,0- SPOONER PARK - TOTAL 50.00 6000 <br />SCHEDULE 7.0. PEDESTRIAN CURS RAMPS <br />I <br />2021,501 <br />MOBILIZATION <br />LS <br />6.02 <br />5800.00 <br />0.00 <br />6000 <br />0.00 <br />5000 <br />2 <br />2521.501 <br />4 "CONCRETE PAVEMENT <br />SY <br />10,00 <br />643.26 <br />0.00 <br />50.00 <br />0.00 <br />50.00 <br />3 <br />2551602 <br />PEDESTRIAN CURD RAMP <br />EACH <br />5927.00000 <br />5000 <br />0.00 <br />8000 <br />4 <br />2531,602 <br />PEDESTRIAN CURD RAMPjCOLORED) <br />EACH <br />5,06 <br />$1 .339.00 <br />000 <br />50.00 <br />0.00 <br />50.00 <br />5 <br />2531.618. <br />TRUNCATED DOMES <br />60 <br />_,. 50.00 <br />53208 <br />0,00 <br />50,00,,,.,,- <br />_.,._ _ 000._,_ <br />50.00 <br />SCHEDULE 5.0- FIREHALL PARKING LOT - TOTAL 60.00 50,00 <br />81D SUMMARY <br />SCHEDULE 1.0- ROSEWOOD DRIVE - TOTAL <br />SCHEDULE 20- PARK STREET -TOTAL <br />SCHEDULE 3.0- SPRUCE STREET -TOTAL <br />SCHEDULE 4.0- SYLVAN STREET - TOTAL <br />SCHEDULE 5.0- FIREHALL PARKING LOT -TOTAL <br />SCHEDULE 0.0 • 5P00NER PARK TOTAL <br />SCHEDULE 5.0- FIREHALL PARKING LOT. TOTAL <br />TOTAL 810 SUMMARY THIS PERIOD <br />TOTAL DID SUMMARY TO DATE <br />THIS PERIOD <br />647,70790 <br />579,926.13 <br />643.692.08 <br />549,554.28 <br />543,623.84 <br />50.00 <br />50.00 <br />5264.504.22 <br />TOTAL TO GATE <br />AMOUNT EARNED <br />AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL DEDUCT. <br />PREVIOUS PAYMENTS <br />AMOUNT DUE <br />TOTAL THIS PERIOD <br />5204,504.22 <br />513,22531 <br />50.00 <br />SO OD <br />5251 279 01 <br />TOTAL TO DATE <br />5264 50n 22 <br />513,225,21 <br />50.00 <br />60.00 <br />60.00 <br />5281,279.01 <br />5 <br />647,707.90 <br />579,926.13 <br />$43,692.08 <br />549,5556.28 <br />543,623.84 <br />50.00 <br />50.00 <br />5264,504.22 <br />