My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-2003 Council Agenda
>
City Council Packets
>
2000-2009
>
2003
>
09-10-2003 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 3:07:07 PM
Creation date
6/14/2012 3:05:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF LITTLE CANADA <br />2003 STREET AND UTILITY IMPROVEMENTS <br />MET TRANSIT COST SHARING <br />ITEM UNIT TOTAL <br />NO. ITEM UNIT QTY PRICE PRICE <br />BUS LANE IMPROVEMENTS <br />1 AGGREGATE BASE CLASS 5 TN 900 $4.70 $4,230.00 <br />2 1 1/2" TYPE LV3 BITUMINOUS BASE COURSE TN 130 $37.25 $4,842.50 <br />3 1 1/2" TYPE MV3 BITUMINOUS BINDER COURSE TN 130 $37.25 $4,842.50 <br />4 1 1/2" TYPE MV4 BITUMINOUS WEAR COURSE TN 130 $40.00 $5,200.00 <br />5 BITUMINOUS MATERIAL FOR TACK COAT GAL 60 $1.20 $72.00 <br />6 1/2" TYPE MV4 BITUMINOUS OVERLAY TN 169 $40.00 $6,760.00 <br />7 COMMON EXCAVATION CY 340 $4.00 $1,360.00 <br />8 CONCRETE PAVERS SF 2,040 $5.33 $10,873.20 <br />9 PEDESTRIAN RAMPS EA 2 $180.00 $360.00 <br />10 CLASS 5 BASE FOR PAVERS TN 90 $10.00 $900.00 <br />11 CONCRETE SLAB SY 39 $38.00 $1,482.00 <br />12 ELECTRICAL UPGRADES LS 1 $6,816.00 $6,816.00 <br />13 POND CONSTRUCTION (PROPORTIONAL) LS 1 $5,000.00 $5,000.00 <br />14 WATER SERVICE CONNECTION EA 1 $420.00 $420.00 <br />15 1" COPPER WATER SERVICE PIPE LF 135 $22.00 $2,970.00 <br />16 8 "X4" SERVICE WYE EA 1 $180.00 $180.00 <br />17 4" TP PIPE DRAIN CLEAN OUT EA 3 $350.00 $1,050.00 <br />18 4" PVC SERVICE PIPE LF 328 $22.00 $7,216.00 <br />19 8" PVC SANITARY EXTENSION LF 45 $40.00 $1,800.00 <br />20 CONSTRUCT SANITARY MANHOLE EA 1 $2,500.00 $2,500.00 <br />T BUS LANE IMPROVEMENT - -TOTAL $68,874.20 <br />BUS LANE IMPROVEMENT -- SUBTOTAL <br />5% CONTINGENCY <br />DESIGN & CONSTRUCTION SERVICES <br />$68,874.20 <br />$3,443.71 <br />$21,695.37 <br />TOTAL ESTIMATED COST $94,013.28 <br />O: /PROJ /819690/0060/Met Transit Costs Final (Park Prices) Sent to MT 0710031.xls <br />- 1 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.