My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-2003 Council Agenda
>
City Council Packets
>
2000-2009
>
2003
>
08-13-2003 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 12:55:47 PM
Creation date
6/18/2012 12:48:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br />To: City of Little Canada <br />From: Lee Elfering <br />Subject: Marketplace Drive Sidewalk <br />Date: August 8, 2003 <br />Honorable Mayor and City Council <br />The attached exhibit indicates the sidewalk improvements for the Market Place Drive area. We <br />are proposing that the sidewalk construction be completed in two phases. The first phase would <br />include construction of a plain concrete or colored concrete walk from the intersection of Market <br />Place Drive and Little Canada Road to the north along the east right -of -way line of Market Place <br />Drive. The sidewalk would be extended to the existing mall building north of the street. in <br />addition, the sidewalk would be installed along the south curb line of Market Place Drive east of <br />Middle Street along the Metro Transit Bus Hub to the street crossing point adjacent to the new <br />Garden Terrace building. <br />The second phase, which we are proposing to have included in next year's improvements, would <br />be construction of the remainder of the sidewalk shown along Market Place Drive, Middle Street, <br />and around the storm water pond. Delaying the second phase of the sidewalk construction until <br />next year will allow time for the development plan of the area to be finalized. This will allow <br />modifications of the sidewalk to better serve the area if necessary. It should also be noted that <br />the City has applied for a grant to assist in the reconstruction of Middle Street and the second <br />phase of the sidewalk construction. At this time, no decision on the grant application has been <br />received. <br />The plans and specifications for the sidewalk construction have been completed. We are <br />requesting that the City Council approve the plans and bidding of the first phase of the work. <br />Depending on the type of sidewalk constructed, it is possible that the first phase of the sidewalk <br />improvements could be constructed for under $50,000, which would allow the City under state law <br />to receive quotes for the work without advertisement. A minimum of three quotes will be obtained <br />to ensure a competitive price is received. <br />C: \WINDOWS \Temporary Internet Files \OLKFIA3 \MEMO- 080803 -CC Plan App..doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.